ESC09-00352
| General Inspection | 9/1/2009 | 9/1/2009 | 9/1/2009 2:41:28 PM | P | PART |
|
|
Verbal to Gary Howard; Need rock construction entrance or block off access from project onto new ParkCenter road at the north side of the new bridge. No signs of discharges into the river. All work to date is taking place within the areas between Walling Creek and the Boise River with adequate vegetative bluffer zones to both locations from denuded soils.
|
ESC09-00540
| Site Preparation | 9/1/2009 | 9/1/2009 | 9/1/2009 1:38:01 PM | | PASS |
|
|
|