FIR11-00056
| INSP-Final Inspection | 9/1/2011 | 9/1/2011 | 9/2/2011 4:43:39 PM | P | DONE |
|
|
Inspection completed 9/2.
|
BLD10-02409
| FIRE-Final Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 5:22:09 PM | P | PASS |
|
|
Life safety inspection passed. Noted unit address numbers to be posted adjacent to respective front entry doors.
|
FIR11-00068
| INSP-Final Inspection | 8/30/2011 | 9/1/2011 | 9/1/2011 4:42:43 PM | A | PART |
|
|
Noted items include; two manual pull stations at the 1st floor to be relocated, provide elevator hat flash upon machine room smoke detection, lock at the breaker to the FACP, signage at the door to the panel room, cd settings at the womens RR basement, 1st and 2nd floors to be adjusted, wall mount strobes in the ceiling position at two mens RR, existing knox box is located distant from the new RA. Functional testing for the new voice evac and PA system passed.
|
BLD11-01206
| FIRE-Final Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 4:35:17 PM | P | PASS |
|
|
Life safety inspection passed.
|
FIR11-00267
| INSP-Final Inspection | 8/31/2011 | 9/1/2011 | 9/1/2011 4:33:05 PM | A | DEFR |
|
|
scott - please call 45 minutes prior Phone #: ###-####
|
FIR11-00450
| INSP-Sprinkler Rough-in | 9/1/2011 | 9/1/2011 | 9/1/2011 4:32:41 PM | P | PART |
|
|
Overhead modifications okay for cover at the drop ceilings.
|
FIR11-00424
| INSP-Final Inspection | 9/1/2011 | 9/1/2011 | 9/1/2011 4:31:35 PM | P | PASS |
|
|
Scope of work completed. Fire sprinkler permit finaled.
|
FIR11-00397
| INSP-Sprinkler Rough-in | 8/31/2011 | 9/1/2011 | 9/1/2011 4:30:42 PM | A | PART |
|
|
Overhead rough-in okayed. Approval for cover pending cold cavity protection verification.
|
FIR10-00137
| INSP-Final Inspection | 8/30/2011 | 9/1/2011 | 9/1/2011 4:28:42 PM | A | PASS |
|
|
Noted correction items finished. Fire alarm permit finaled.
|