Inspections for the day of: Thursday, September 1, 2011.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-00870 FIRE-Conference8/31/20119/1/20119/6/2011 10:03:19 AMADONE
I left message for Ken at Allied General and also spoke to Todd at Solution Pro about getting the fire alarm permit for this project. I set up a follow up inspection for two weeks from today.
FIR10-00248 FIR-Aging Inspection9/1/20119/1/20119/2/2011 12:58:11 PM DONE
Per robert this should be called in for next week.
FIR11-00393 INSP-Alarm Testing9/1/20119/1/20119/2/2011 12:55:33 PMPCANC
Over booked.
FIR11-00285 INSP-Supply line flush9/1/20119/1/20119/1/2011 3:46:13 PMPPASS
Underground supply line flush passed
BLD11-00832 FIRE-Final Inspection8/31/20119/1/20119/1/2011 2:34:08 PMPFAIL
Repair the emergency light and provide the two missing doors near the east exit ( under stairs) or provide plan review approval they can be deleted.
BLD11-00263 FIRE-Final Inspection8/31/20119/1/20119/1/2011 2:32:02 PMPPASS
life safety passed
FIR10-00033 INSP-Conference9/1/20119/1/20119/1/2011 2:26:58 PMPDONE
I spoke to Carl at ###-#### about getting this permit finaled. He is contacting simplex.
BLD11-00028 FIRE-Final Inspection8/31/20119/1/20119/1/2011 11:30:32 AMAPASS
life safety passed.
FIR11-00350 INSP-Sprinkler Rough-in8/31/20119/1/20119/1/2011 11:19:34 AMAPART
Sprinkler piping can be covered but the existing 3" main needs to be attached to the building structure as discussed. This will be verified at the final.
FIR11-00446 INSP-Final Inspection8/31/20119/1/20119/1/2011 11:18:04 AMAPASS
permit finaled
FIR11-00281 INSP-Final Inspection8/31/20119/1/20119/1/2011 11:17:40 AMAPASS
permit finaled
FIR11-00339 INSP-Final Inspection8/31/20119/1/20119/1/2011 11:17:18 AMAPASS
Permit finaled