MEC16-02081
| Rough-in | 8/31/2016 | 9/1/2016 | 9/1/2016 4:07:19 PM | P | PASS |
|
|
3rd floor rough-in Phone #: ###-#### Inspection requested via web by Dustin Rich- 3rd floor ok to cover
|
MEC16-02765
| Final | 9/1/2016 | 9/1/2016 | 9/1/2016 3:45:17 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss
|
MEC16-03964
| Final | 9/1/2016 | 9/1/2016 | 9/1/2016 3:26:23 PM | P | PASS |
|
|
LATE PM INSPECTION PLEASE IF POSSIBLE INSTALLER: CODY ###-#### THANK YOU Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC16-03424
| Rough-in | 9/1/2016 | 9/1/2016 | 9/1/2016 3:00:23 PM | P | PASS |
|
|
call rob. 3rd floor ceiling inspection. 2nd floor angles Inspection requested via web by william kerwin 3rd floor ok to cover, 2nd floor angle ok
|
MEC16-00789
| Final | 9/1/2016 | 9/1/2016 | 9/1/2016 2:01:56 PM | P | FAIL |
|
|
Thank you! Phone #: ###-#### Inspection requested via web by Xanti Berria- couldnt get in to look at units wet grout, closet shelves need to be mooved
|
MEC16-03974
| Final | 9/1/2016 | 9/1/2016 | 9/1/2016 1:36:49 PM | P | PASS |
|
|
Would like early PM and a call when on way. Thank you!! Phone #: ###-#### Inspection requested via web by Xanti Berria
|
MEC16-03974
| Pressure Test | 9/1/2016 | 9/1/2016 | 9/1/2016 1:35:12 PM | P | PASS |
|
|
Would like early PM and a call when on way. Thank you!! Phone #: ###-#### Inspection requested via web by Xanti Berria 5lb flue
|
MEC16-02664
| Final | 9/1/2016 | 9/1/2016 | 9/1/2016 1:34:45 PM | P | CANC |
|
|
Contact Ryan with questions ###-#### Phone #: ###-#### Inspection requested via web by Lea Briggs called by mistake
|
MEC16-01056
| Final | 8/31/2016 | 9/1/2016 | 9/1/2016 11:38:47 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dan Otero
|
MEC16-03882
| Rough-in | 8/31/2016 | 9/1/2016 | 9/1/2016 11:38:30 AM | A | PASS |
|
|
BRAXTON ###-#### Phone #: ###-#### Inspection requested via web by Jason Robinson
|
MEC16-03754
| Rough-in | 8/31/2016 | 9/1/2016 | 9/1/2016 10:52:59 AM | A | PART |
|
|
Please do the rough-in inspection. I believe the pressure witness is done because you let the air out. The hood make-up air is the 8" duct from the roof to the plehnum. A motorized damper will be wired in with the hood, The house fresh air is the 8" duct from the soffit to the plehnum. Call James at ###-#### with any questions, thanks. Inspection requested via web by 4 Seasons 20lb gas, 5lb flue, top roughin ok, soffit damper to be installed at trim radiant damper is built into grille. crawl still needs to be completed
|
MEC16-03795
| Rough-in | 8/31/2016 | 9/1/2016 | 9/1/2016 9:48:41 AM | A | PASS |
|
|
light test for duct in the chase. as early as possible please. Phone #: ###-#### Inspection requested via web by Drew Tverdy- chase duct ok to start 1st layer fire wrap
|
MEC16-03596
| Conference | 8/31/2016 | 9/1/2016 | 9/1/2016 9:25:20 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
MEC16-03596
| Rough-in | 9/1/2016 | 9/1/2016 | 9/1/2016 9:25:08 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Oleg Chervak
|
MEC16-03964
| Final | 8/31/2016 | 9/1/2016 | 9/1/2016 9:16:01 AM | A | NR |
|
|
Late AM inspection please Installer: Cody ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich
|
MEC16-02765
| Final | 8/31/2016 | 9/1/2016 | 9/1/2016 9:06:19 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Krista Boss fresh air needs to be insulated to prevent condensation
|
MEC16-03967
| Pressure Test | 8/31/2016 | 9/1/2016 | 9/1/2016 8:52:37 AM | A | PASS |
|
|
Early AM if possible Contact Jesse: ###-#### Thank you Phone #: ###-#### Inspection requested via web by Dustin Rich 20lb gas, pipe
|
MEC16-00629
| Mec-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/1/2016 8:08:34 AM | | PEND |
|
|
|
MEC15-05230
| Mec-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/1/2016 8:07:12 AM | | CANC |
|
|
|
MEC15-05186
| Mec-Aging Inspection | 9/1/2016 | 9/1/2016 | 9/1/2016 8:05:38 AM | | CANC |
|
|
|