BLD96-01427
| INSP - Carpentry | 9/10/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | | PART |
|
|
/ / 340 - ok to pre-rock at common wall and 1hr truss at 5'
|
BLD96-02062
| INSP - Final | 9/6/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | A | FAIL |
|
|
09/09/96 340 - nr, need door,wall detail, 1hr at corr wall seismic at gr
|
BLD96-00928
| INSP - Final | 9/9/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | A | NR |
|
|
09/09/96 340 - no access, door locked
|
BLD96-01293
| INSP - Wall cover | 9/9/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | P | PART |
|
|
09/09/96 340 - NAILING ...need fireblocks at 10'
|
BLD96-01294
| INSP - Wall cover | 9/9/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | P | PART |
|
|
09/09/96 340 - NAILING ...int membrane(5/8" gyp) &fireblocks ok
|
BLD96-00723
| INSP - Energy code compliance | 9/9/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | P | PASS |
|
|
09/09/96 340 - RE-SCHEDULED FROM 9-9-96 PM ins ok
|
BLD96-00723
| INSP - Framing/Rough-in | 9/9/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | P | PASS |
|
|
09/09/96 340 - RE-SCHEDULED FROM 9-9-96 PM c/n ok
|
BLD96-02075
| INSP - Framing/Rough-in | 9/10/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | P | PASS |
|
|
09/10/96 340 - ok to ins...remodel
|
BLD96-01813
| INSP - Framing/Rough-in | 9/10/1996 | 9/10/1996 | 9/10/1996 12:00:00 AM | P | FAIL |
|
|
09/10/96 340 - c/n, nr
|