BLD01-01190
| BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | | PASS |
|
|
finalled previously per records; ok for l/c 9/10/2001 8:40:20 AM
|
BLD01-00208
| BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | | NR |
|
|
has c/n, spoke w/ owner/arch...wip 9/10/2001 9:32:00 AM
|
BLD01-00553
| BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | | NR |
|
|
per Pete Rockwell, add'l permit in for review now to complete project...add fire door to adjacent space, etc. 9/10/2001 9:31:29 AM
|
BLD01-00362
| BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | | NR |
|
|
has c/n, spoke w/ Pete Rockwell 9/10/2001 9:27:41 AM
|
BLD01-00887
| BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | | NR |
|
|
expires 10-6-01; permit to BURN bldg??? w/ $6000 bond 9/10/2001 2:21:41 PM
|
BLD00-03195
| BLD-Aging Inspection | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | | PART |
|
|
sfd, wip... 9/10/2001 8:37:31 AM
|
BLD01-01806
| BLD-Final | 9/7/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | A | PASS |
|
|
###-#### jeff \\call first
|
BLD00-03729
| BLD-Concrete | 9/7/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | A | PART |
|
|
###-#### masonry lift; MTI onsite 9/10/2001 10:45:33 AM
|
BLD01-01426
| BLD-Final | 9/7/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | A | PASS |
|
|
fn terry -###-#### ok for c/o, card not onsite, ok to sign at office 9/11/2001 11:13:05 AM
|
BLD01-01689
| BLD-Framing/Rough-in | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | A | FAIL |
|
|
Added by Inspector: 340 On 9/10/2001 10:21:04 AM add 3rd #1 2x12 & reduce span to 10' max. or need calcs to justify beam carrying 2nd floor at stairs...ext shear ok
|
BLD00-03729
| BLD-Conference | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/10/2001 11:54:13 AM w/ Bruce, supt & Gary, spec. insp...need submittal from steel fab re "approved" status
|
BLD01-00915
| BLD-Conference | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/10/2001 9:22:00 AM w/ arch R. Honsiger...need plans onsite, reinsp fee due prior to final ok.
|
BLD01-01689
| BLD-Other | 9/9/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/09/2001 at 17:24:38. Contact: ###-####. ext shear ok to side at n/s...add blocks at front porch area panels. ok to continue. 9/10/2001 10:17:56 AM
|
BLD01-01854
| BLD-Framing/Rough-in | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | P | PART |
|
|
Don Bryan, ###-#### (ceiling, too) walls ok pend plbg, add clg wires at S W & seismic pod s; chk at final9/10/2001 2:54:18 PM 9/10/2001 2:54:55 PM
|
MEC01-01968
| Pressure Test | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 09:33:04. Contact: ###-####. ug stub to em gen. wrap poly pipe at wall ;ok to bury 9/10/2001 4:10:46 PM
|
BLD01-00379
| BLD-Concrete | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 340 On 9/10/2001 4:09:08 PM ok to place non shrink grout at bsmt col bases...will photo.
|
BLD01-00594
| BLD-Conference | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 9/10/2001 4:58:59 PM w/ Otis Lemon...need stamped detail/letter re shear, keep c/n.
|
BLD01-00809
| BLD-Conference | 9/7/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 9/7/2001 4:53:45 PM Darrel ###-#### rec'd detail for thru penetrations at floor...will consult plan review 9/10/2001 3:53:44 PM
|
BLD01-00600
| BLD-Framing/Rough-in | 9/10/2001 | 9/10/2001 | 9/10/2001 12:00:00 AM | P | PART |
|
|
FR JIM ###-#### shear wall straps 1st to 2nd fl 9/10/2001 4:49:10 PM
|