Inspections for the day of: Tuesday, September 10, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00906 Plumbing Rough-in9/9/20029/10/20029/10/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/09/2002 at 11:57:42. Contact: ###-####. 2ND FLOOR ROOMS 222 AND 224 RESTROOMS test failed 9/10/2002 4:43:06 PM
PLM02-02306 Plumbing Rough-in9/9/20029/10/20029/10/2002 12:00:00 AMAFAIL
paul ###-#### r/i sewage ejector overloads 2" discharge line, island sink vent taken off the sink drain. 9/10/2002 9:00:25 AM
PLM02-02753 Plumbing Rough-in9/9/20029/10/20029/10/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/09/2002 at 13:23:44. Contact: ###-####.
PLM02-02792 Plumbing Rough-in9/9/20029/10/20029/10/2002 12:00:00 AMAFAIL
james ###-#### leak in lav waste, hang 2" to lav under shower, wase test failed 9/10/2002 3:35:06 PM
PLM02-02759 Plumbing Rough-in9/10/20029/10/20029/10/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/10/2002 at 08:12:45. Contact: ###-####. island sink waste ok 9/10/2002 2:15:49 PM
PLM02-02804 Water and/or Sewer9/10/20029/10/20029/10/2002 12:00:00 AMPNR
jvon- ###-####
PLM02-02752 Final9/10/20029/10/20029/10/2002 12:00:00 AMPPASS
wayne; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie the waste arm for the hand sink in the kitchen is way long but for the conditions it looks like it will work fine 9/10/2002 2:34:04 PM
PLM02-02806 Water and/or Sewer9/10/20029/10/20029/10/2002 12:00:00 AMPPASS
jeff ###-#### s/w final ok with clean fill 9/10/2002 2:51:45 PM
PLM02-02306 Plumbing Rough-in9/10/20029/10/20029/10/2002 12:00:00 AMPPASS