BLD01-03253
| FIRE-Final Inspection | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 15:54:04. Contact: ###-####.
|
BLD02-01868
| FIRE-Final Inspection | 9/10/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | P | PASS |
|
|
ray ###-####
|
FIR02-00310
| INSP-Sprinkler Rough-in/Hydro | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 08:01:00. Contact: ###-####. heads overspaced at corridor wall in showroom; add head at main entrance; PIV not installed; FDC will rewuire sign to prevent parking blocking it; add 911 on outside bell; test alarms when installed; hydro okay 9/10/2002 3:57:43 PM
|