MEC02-02523
| Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 11:37:57. Contact: ....###-#### charlie 9/10/2002 9:22:24 AM ok to cover hydronics from cooling tower to bldg 9/10/2002 9:50:12 AM
|
MEC02-01263
| Final | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | A | FAIL |
|
|
meet JD at 8 am plumbing vents to be 10' from air intake to unit...waiting on struc 9/10/2002 10:55:36 AM...JD'S PHONE # IS 944531 9/10/2002 10:56:38 AM
|
MEC02-02510
| Pressure Test | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | A | FAIL |
|
|
###-#### dennis NEED BTU LOAD AND LENGTH OF PIPE..TALKED TO CONT 9/10/2002 12:20:29 PM
|
MEC02-02442
| Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | A | FAIL |
|
|
This is a R/I for cover. Please call Rob Thank you!!; Phone #: ###-#### Internet Inspection Request from: Amanda Van Paepeghem NO COMB IN R/A PLENUM...CALLED CONT 9/10/2002 12:20:46 PM
|
MEC02-02431
| Rough-in | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 17:01:22. Contact: ###-####.
|
MEC02-02451
| Final | 9/10/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | P | NH |
|
|
ablecraft; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie..OFF SHENANDOAH 9/10/2002 1:41:36 PM called home owner..nobody home..left message 9/10/2002 5:08:21 PM
|
MEC02-01854
| Final | 9/10/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 11:03:39. Contact: ###-####.
|
MEC02-02236
| Final | 9/10/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
|
MEC02-02533
| Pressure Test | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 16:07:00. Contact: ###-####...36TH..LEFT ON CATALPA..RIGHT ON HAWTHORNE 9/10/2002 1:39:58 PM called lee and left message at 4:00..need info on job 9/10/2002 5:08:42 PM
|
MEC02-02533
| Final | 9/9/2002 | 9/10/2002 | 9/10/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/09/2002 at 16:07:21. Contact: ###-####.
|