Inspections for the day of: Wednesday, September 10, 2003.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRon Ginner
TitlePLM-INSPECTOR
Phone #794-9485
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-02793 Plumbing Rough-in9/9/20039/10/20039/10/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/9/2003 at 12:43:51 PM.
PLM03-02804 Sprinkler (Final)9/9/20039/10/20039/10/2003 12:00:00 AMAPASS
PAUL; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
PLM03-01517 Plumbing Rough-in9/9/20039/10/20039/10/2003 12:00:00 AMAPASS
OFFICE; Phone #: ###-#### Internet Inspection Request from: Darla Downs no backwater valve in ground work? no vent on existing tub. 9/10/2003 11:45:06 AM 9/10/2003 11:47:29 AM
PLM03-02795 Plumbing Rough-in9/9/20039/10/20039/10/2003 12:00:00 AMAFAIL
BEN; Phone #: ###-#### Internet Inspection Request from: Marc Lileks 1. no pressure on water lines 2. trap arm not graded 3. support line to kitchen at crawel space entrance. 9/10/2003 10:41:46 AM
PLM03-02813 Water and/or Sewer9/9/20039/10/20039/10/2003 12:00:00 AMAPASS
LARRY; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
PLM03-02003 Final9/10/20039/10/20039/10/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 9/10/2003 at 10:08:06 AM. Contact: ###-####. bldg backflow not tested, can't find backflow for fire sprinkler sys, water heater pan drain goes into crawel space must go outside the bldg 9/10/2003 2:59:13 PM
PLM03-02821 Water and/or Sewer9/10/20039/10/20039/10/2003 12:00:00 AMPPASS
###-#### scott
PLM03-00816 Final9/4/20039/10/20039/10/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/4/2003 at 4:11:25 PM. Contact: ###-####.
PLM03-02801 Final9/9/20039/10/20039/10/2003 12:00:00 AMPPASS
susie please call first; Phone #: ###-#### Internet Inspection Request from: Darla Downs