Inspections for the day of: Friday, September 10, 2004.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-00999 BLD-Framing/Rough-in9/8/20049/10/20049/10/2004 12:00:00 AMAPART
shane; Phone #: ###-#### Internet Inspection Request from: Barbara Moore C/N Verify approval and special insp for steel at fab shop.....need special insp of bolting prior to final frame insp. Complete sheathing and re-call. 9/10/2004 12:15:31 PM
BLD04-01877 BLD-Foundation9/9/20049/10/20049/10/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/9/2004 at 11:07:08 AM. Contact: ###-####.
BLD04-01448 BLD-Framing/Rough-in9/9/20049/10/20049/10/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 9/9/2004 at 3:34:12 PM. Contact: ###-####. C/N posted. 9/10/2004 11:32:39 AM
BLD04-01948 BLD-Foundation9/10/20049/10/20049/10/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/10/2004 at 6:48:29 AM. Contact: ###-####. should be footing insp. ok 9/10/2004 3:42:04 PM
BLD04-00906 BLD-Framing/Rough-in9/10/20049/10/20049/10/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 9/10/2004 at 7:46:16 AM. Contact: ###-####.
MEC04-02098 Pressure Test9/10/20049/10/20049/10/2004 12:00:00 AMPPASS
###-#### lindsay
MEC04-02418 Rough-in9/9/20049/10/20049/10/2004 12:00:00 AMPPASS
Late afternoon please////###-#### dana
MEC04-02408 Final9/9/20049/10/20049/10/2004 12:00:00 AMPPASS
###-#### - thomas - please 1/2 hr prior to inspection
BLD04-00912 BLD-Final9/9/20049/10/20049/10/2004 12:00:00 AMPNH
allen-- ###-#### No access....called Allan. 9/10/2004 3:42:32 PM
BLD03-03027 BLD-Framing/Rough-in9/8/20049/10/20049/10/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/8/2004 at 7:40:43 AM. Need straps at micros to wall, complete shear wall W.of restrms. OK to insulate.

9/10/2004 3:37:17 PM 9/10/2004 3:37:42 PM