Inspections for the day of: Wednesday, September 10, 2008.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02320 BLD-Framing/Rough-in9/10/20089/10/20089/10/2008 5:31:44 PMPPART
ok to prerock 2nd floor corridor lids.
ESC06-01309 Random Inspection9/10/20089/10/20089/10/2008 5:31:09 PMPPASS
BLD08-01326 BLD-Foundation9/10/20089/10/20089/10/2008 4:04:33 PMPCANC
Phil Phone #: ###-####
ESC08-00535 Random Inspection9/10/20089/10/20089/10/2008 3:49:56 PMPPASS
ESC07-00876 BMP Violation9/10/20089/10/20089/10/2008 3:48:34 PMPPASS
Controlled entry point set up. Due to material being removed and replaced frequwntly tarack out is being swept.
BLD07-01846 BLD-Framing/Rough-in9/5/20089/10/20089/10/2008 3:35:17 PMPPART
Framing for new parapet.
BLD08-01907 BLD-Footing9/10/20089/10/20089/10/2008 1:52:39 PMPPART
john- Phone #: ###-####. Column pad footings for shade structure.
ESC07-01577 Site Final9/10/20089/10/20089/10/2008 1:35:03 PMPPASS
Site is clean. All sitework and landscaping completed. 70% reveg has been achieved.
BLD07-03240 BLD-Final9/10/20089/10/20089/10/2008 1:33:47 PMPPASS
Scheduled by a contractor via Hello! on 9/10/2008 at 10:44:17 AM. Contact: ###-####.countertop lowered. ok for perm occ.
BLD08-01773 BLD-Energy code compliance9/10/20089/10/20089/10/2008 1:21:29 PMPPASS
Brett- call 30 mins prior to going Phone #: ###-####. ok to cover.
BLD06-02320 BLD-Framing/Rough-in9/9/20089/10/20089/10/2008 11:25:28 AMACANC
Re-inspect the 2nd floor corridor ceiling for pre-rock on bldg 3. Phone #: ###-#### Internet Inspection Request from: Bob Thornton. reshduled for this afternoon.
ESC08-00726 Site Preparation9/10/20089/10/20089/10/2008 11:17:44 AMAPASS
BLD08-01850 BLD-Foundation9/9/20089/10/20089/10/2008 11:17:17 AMAPART
JARED Phone #: ###-####
BLD08-00901 BLD-Framing/Rough-in9/9/20089/10/20089/10/2008 10:57:08 AMACANC
andy Phone #: ###-####
ESC08-00365 General Inspection9/10/20089/10/20089/10/2008 10:56:54 AMAPASS
General site conditions were good.
BLD08-00896 BLD-Framing/Rough-in9/9/20089/10/20089/10/2008 10:56:24 AMAPART
andy Note: need 1st in morning due roofer will be first thing Phone #: ###-####. Exterior shear nailing for walls and roof diaphragm only. ok to cover.
MIS08-00125 BLD-Conference9/9/20089/10/20089/10/2008 9:56:07 AMANH
This is for a home purchase. Please contact Sharon Wilson at number provided, at least 1/2 hour before arriving so you can get access. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer. Not home. Called provided number and left message to met me at specified time. Recieved no call back as of 9:55am
ESC08-00464 Random Inspection9/10/20089/10/20089/10/2008 9:48:47 AMAPASS
ESC permit signs posted. Dust control measures are being employed. General site conditions were good.
BLD08-01127 BLD-Framing/Rough-in9/9/20089/10/20089/10/2008 9:47:40 AMACANC
Scheduled by a contractor via Hello! on 9/9/2008 at 5:40:59 PM. Contact: ###-####.
BLD08-01127 BLD-Footing9/9/20089/10/20089/10/2008 9:47:21 AMAPART
Scheduled by a contractor via Hello! on 9/9/2008 at 5:39:21 PM. Contact: ###-####. Exterior footings on grids C and G between grids 7 to 11 and on grid 11 between grids c to G. Spoke with engineer from Tamarack engineering on vertical reinforcement. Should be #4 at 16" oc then #6 verts at 24"oc for masonry const. RFI will be sent to contractor. Ok to place conc. once special insp agency has inspected the completed work.