FIR08-00831
| INSP-Sprinkler Rough-in | 9/10/2009 | 9/10/2009 | 9/11/2009 7:24:37 AM | P | PASS |
|
|
This turned into a conference on what was left to complete on this project.
|
FIR09-00317
| INSP-Sprinkler Rough-in/Hydro | 9/9/2009 | 9/10/2009 | 9/10/2009 12:53:42 PM | P | PASS |
|
|
Start of 24 hour air test at 12:00. The starting pressures have been written on the wall adjacent to the risers with the current air pressure.
|
BLD09-00791
| FIRE-Final Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 12:52:07 PM | A | PART |
|
|
Life safety passed.
|
FIR09-00317
| INSP-Sprinkler Rough-in/Hydro | 9/9/2009 | 9/10/2009 | 9/10/2009 12:51:31 PM | A | PASS |
|
|
System #2 passed hydrostatic testing.
|
BLD07-01846
| FIRE-Sprinkler Rough-in | 9/10/2009 | 9/10/2009 | 9/10/2009 12:50:33 PM | P | FAIL |
|
|
The project related fire alarm permit needs addressed prior to life safety. I did have the emergency light in the shower room tested while I was waiting for the fire alarm contractor. Will need to be rescheduled.
|
FIR08-00382
| INSP-Alarm Testing | 9/10/2009 | 9/10/2009 | 9/10/2009 12:49:09 PM | P | FAIL |
|
|
The fire alarm contractor was not available while I was on site for the inspection. To be rescheduled.
|
BLD08-02496
| FIRE-Final Inspection | 9/8/2009 | 9/10/2009 | 9/10/2009 11:12:38 AM | A | PASS |
|
|
Life safety passed.
|
FIR07-01032
| INSP-Sprinkler Rough-in | 9/9/2009 | 9/10/2009 | 9/10/2009 10:48:11 AM | A | PASS |
|
|
See the city approved plans for locations where the piping can be covered.
|
BLD09-01483
| FIRE-Final Inspection | 9/9/2009 | 9/10/2009 | 9/10/2009 10:47:31 AM | A | FAIL |
|
|
Remove the thumbturn from the main exit. Keyed hardware on the egress side is ok if the sticker is provided. Remove the thumbturn locks on all of the other exterior doors. Provide approved floor plan that matches the actual wall layout.
|
BLD09-01482
| FIRE-Final Inspection | 9/9/2009 | 9/10/2009 | 9/10/2009 10:43:39 AM | A | FAIL |
|
|
Provide single action hardware on the warehouse door.
|