BLD09-01309
| BLD-Framing/Rough-in | 9/10/2009 | 9/10/2009 | 9/10/2009 4:06:32 PM | P | PART |
|
|
matt Phone #: ###-####. attacment of 5/8 type x rock to back side of 1hr room. ok.
|
BLD08-02496
| BLD-Final | 9/10/2009 | 9/10/2009 | 9/10/2009 3:13:35 PM | P | PASS |
|
|
Chris Phone #: ###-####. ok for perm occ.
|
ESC09-00456
| General Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 2:59:26 PM | P | PASS |
|
|
|
BLD09-01206
| BLD-Framing/Rough-in | 9/9/2009 | 9/10/2009 | 9/10/2009 2:59:11 PM | P | FAIL |
|
|
Robert Phone #: ###-####. Provide strap acroaa top plate from existing structure to new structure. Needs to wire and install smoke detectors. c/n posted.
|
ESC09-00287
| Random Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 2:44:08 PM | P | PASS |
|
|
|
ESC09-00567
| Site Preparation | 9/10/2009 | 9/10/2009 | 9/10/2009 2:34:57 PM | P | PASS |
|
|
ESC permit sign posted. Due to small placement, no washout was required.
|
BLD09-01531
| BLD-Footing | 9/10/2009 | 9/10/2009 | 9/10/2009 2:34:13 PM | P | PASS |
|
|
Eric-around 1 if possible please Phone #: ###-####
|
BLD09-00791
| BLD-Final | 9/10/2009 | 9/10/2009 | 9/10/2009 2:24:36 PM | P | NR |
|
|
Darren Phone #: ###-####. Neds to remove the keyed lock on west exit door and provide transition at end of ramp at east exit door and get elec. temp.
|
ESC09-00377
| Site Preparation | 9/10/2009 | 9/10/2009 | 9/10/2009 1:19:41 PM | | NR |
|
|
Contractor on site, but work has not yet started, nor ESC permit and plans on site. Noted to contractor to make sure all ESC elements are in plce prior to starting demo. Will reschedule at later date.
|
ESC09-00281
| Random Inspection | 9/10/2009 | 9/10/2009 | 9/10/2009 10:39:05 AM | A | PASS |
|
|
|
BLD09-00772
| BLD-Framing/Rough-in | 9/9/2009 | 9/10/2009 | 9/10/2009 10:38:49 AM | A | FAIL |
|
|
Majdi Phone #: ###-####. Needs to add gable end bracing at 6ft. oc as shown on approved plan. c/n issued. Contractor was notified while on site.
|
ESC09-00474
| BMP Violation | 9/10/2009 | 9/10/2009 | 9/10/2009 10:09:09 AM | A | PASS |
|
|
All blowable trash has been picked up.
|
BLD09-01246
| BLD-Energy code compliance | 9/9/2009 | 9/10/2009 | 9/10/2009 10:08:23 AM | A | PASS |
|
|
Rustin Phone #: ###-####
|
BLD09-00965
| BLD-Other | 9/9/2009 | 9/10/2009 | 9/10/2009 9:48:41 AM | A | PART |
|
|
jared - masonary wall Phone #: ###-####. wip on masonry wall construction, southwall tow, 17ft. 4in. elev. on remaining walls. special inspector was on site. Also reviewed all special insp. reports to date. No deficiencies were noted.
|
ESC09-00567
| Site Preparation | 9/10/2009 | 9/10/2009 | 9/10/2009 8:59:05 AM | | CANC |
|
|
|