Inspections for the day of: Friday, September 10, 2010.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD10-00664 FIRE-Final Inspection9/10/20109/10/20109/10/2010 4:33:06 PMPCANC
Overbooked
FIR10-00355 INSP-Sprinkler Rough-in/Hydro9/9/20109/10/20109/10/2010 4:30:05 PMPPART
Overhead hydrostatic test of the wet system riser adjacent to the dry valve passed.
BLD10-01015 FIRE-Final Inspection9/9/20109/10/20109/10/2010 4:16:36 PMAPASS
Fire life safety inspection passed.
BLD10-01718 FIRE-Final Inspection9/10/20109/10/20109/10/2010 3:47:27 PMPCANC
Overbooked
BLD10-01207 FIRE-Final Inspection9/9/20109/10/20109/10/2010 3:38:53 PMAFAIL
See fire code review notes items # 5, 6, 11, and 30 for items in need of revision including knox box, address numbers, EM lighting, signage at the riser room door. Replace ceiling at the comm room and provide missing escutcheon.
FIR10-00402 INSP-Final Inspection9/9/20109/10/20109/10/2010 3:36:15 PMAPASS
Noted corrections verified for compliance. Fire alarm testing passed, permit finaled.
BLD10-01588 FIRE-Final Inspection9/9/20109/10/20109/10/2010 2:35:40 PMPCANC
Overbooked
FIR10-00395 INSP-Final Inspection9/9/20109/10/20109/10/2010 2:16:50 PMACANC
Overbooked
BLD10-01693 FIRE-Final Inspection9/9/20109/10/20109/10/2010 2:13:24 PMAPART
Phase one temp okay per T. Cobbley.
BLD10-01600 FIRE-Final Inspection9/10/20109/10/20109/10/2010 1:40:55 PMPFAIL
Provide approved door hardware at two locations, remove the manual thumbturn at the lower level exit.
BLD10-00636 FIRE-Final Inspection9/10/20109/10/20109/10/2010 12:51:05 PMPFAIL
Refer to activity notes for a list deficient items.
BLD10-00636 FIRE-Final Inspection9/9/20109/10/20109/10/2010 12:48:50 PMAFAIL
Provide missing building address numbers, post signage at the main entry/exit door, project related fire alarm and sprinkler permits need finaled- see correction items regarding fire sprinkler work.
FIR10-00338 INSP-Final Inspection9/9/20109/10/20109/10/2010 12:46:58 PMAFAIL
SW head at the exterior compressor room appears painted, provide bags at pendent heads in the spray booth per NFPA 13, upright heads within the 7' zone of the unit heaters must be high temperature per fig.8.3.2.5, control valve at supply to booth heads needs to be supervised.
BLD10-00924 FIRE-Conference9/9/20109/10/20109/10/2010 12:01:08 PMADONE
On site conference with contractor regarding fire life safety items including door hardware, exit signs/EM lights, review notes, project related fire alarm work, etc. Missing city approved plan set on site.
BLD10-02083 FIRE-Final Inspection9/9/20109/10/20109/10/2010 11:58:54 AMAPASS
Fire life safety inspection completed acceptable, door hardware at one location changed while on site, existing sprinkler system is current with annual certification tags.
BLD10-01052 FIRE-Final Inspection9/9/20109/10/20109/10/2010 11:56:01 AMAPASS
Fire life safety final approved, project related fire alarm and sprinkler permits are complete.
FIR10-00450 INSP-Sprinkler Rough-in9/10/20109/10/20109/10/2010 11:48:11 AMPPART
Overhead fire sprinkler work is approved for cover.