Inspections for the day of: Friday, September 10, 2010.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00283 Site Preparation9/10/20109/10/20109/10/2010 3:13:22 PMPPART
Verbal to RP, expand rock construction entrance and discussion regarding washout prior to placment of concrete took place. Signage is posted. RP has been changed in the system which reflects the person with day-to-day control.
ESC10-00643 Site Preparation9/10/20109/10/20109/10/2010 2:25:48 PMPPASS
Work is progressing to restore the slope; At the time of inspection 13 feet of geogrid and 3/4 road mix has been placed. Discussed the need to place sediment barriers in misc. locations at the end of the day on the project access road. Estimated completion to place material--two more weeks and it should be close to the end.
ESC10-00673 Site Preparation9/10/20109/10/20109/10/2010 1:34:47 PM NR
Pending legal decision-Re-scheduled
ESC10-00352 Conference9/9/20109/10/20109/10/2010 11:30:11 AMADONE
10:30 Review ESC plan and discuss final stabilzation measures. Met with general contractor and owner, (Hawkins). Upon completeion of demo of structures & hard surfaces the site will be final graded and then contractor will file NOT (transfered to other filer (Hawkins). At this point the bond may be released (BLD finaled). The ESC will remain open until the ground has been seeded and 70% growth has been established. Informed Hawkins that inspections will need to continue to take place until the site is ready to close, (70% growth). Access controls (concrete barricades) are expected at all access points to reduce any traffic and trackout.
ESC10-00637 Site Preparation9/10/20109/10/20109/10/2010 7:56:20 AM CANC
Inspector 301 passes on 9/7/10