Inspections for the day of: Friday, September 10, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00676 Site Preparation9/10/20109/10/20109/10/2010 4:25:50 PM CANC
ESC10-00677 Site Preparation9/10/20109/10/20109/10/2010 4:08:46 PM PASS
ESC10-00374 BMP Violation9/9/20109/10/20109/10/2010 3:24:48 PMPFAIL
Message to RP:
CORRECTION NOTICE:
1 Install a sediment barrier along the back of sidewalk where there is any disturbed soil.
2. Install storm drain inlet protection wwithin the storm drain to the west of project.
**Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 9/13/10PM
ESC10-00010 General Inspection ESC9/10/20109/10/20109/10/2010 1:59:29 PM CANC
ESC10-00473 Site Final9/10/20109/10/20109/10/2010 1:53:20 PMAPASS
ESC10-00631 Site Preparation9/10/20109/10/20109/10/2010 1:01:20 PM CANC
Inspected previously.
ESC10-00283 BMP Violation9/9/20109/10/20109/10/2010 1:00:58 PMAPASS
ESC10-00531 Site Preparation9/9/20109/10/20109/10/2010 1:00:45 PMAPART
Spoke with RP and excavating company:
Re-install sediment barrier per industry standards. At the end of the work must clean up all sediment off of all hard surfaces at the transfer area located at the north end of project. Will re-inspect on 9/13/10am.
ESC10-00613 General Inspection9/8/20109/10/20109/10/2010 9:38:44 AMAPART
Updated RP.