PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, September 10, 2012
.
Number of inspections:
11
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC11-00884
BMP Violation
9/10/2012
9/10/2012
9/10/2012 9:57:34 PM
P
FAIL
RP explained that the final landscape and the driveway will be complete by mid this week. I explained to him that even though the projet is almost complete, that he must still remove the nylon silt fence screening out of the storm drain and place in an approved storm drain inlet protection, (ex: silt saver, blocksom, or a dandy bag). Will inspect on 9/12/2012 11AM for project status.
ESC11-00176
General Inspection
9/10/2012
9/10/2012
9/10/2012 2:59:05 PM
FAIL
Verbal to RP:
Clean up all sediment residual out of the gutter pans and maintain the storm drain inlet in the corner of Epsilon and Deer Forked.
ESC11-00590
General Inspection
9/10/2012
9/10/2012
9/10/2012 1:21:34 PM
PASS
ESC11-00517
General Inspection
9/10/2012
9/10/2012
9/10/2012 1:21:22 PM
PASS
ESC11-00518
General Inspection
9/10/2012
9/10/2012
9/10/2012 1:21:10 PM
PASS
ESC12-00910
Site Preparation
9/10/2012
9/10/2012
9/10/2012 1:20:30 PM
PASS
ESC11-00580
General Inspection
9/10/2012
9/10/2012
9/10/2012 1:19:00 PM
DONE
PErmit finaled.
ESC11-00580
DOC - Permit Finaled
9/10/2012
9/10/2012
9/10/2012 1:18:50 PM
P
PASS
ESC10-00822
Aging Inspection
9/10/2012
9/10/2012
9/10/2012 1:17:47 PM
PASS
ESC11-00408
General Inspection
9/10/2012
9/10/2012
9/10/2012 1:17:04 PM
PASS
ESC12-00403
General Inspection
9/10/2012
9/10/2012
9/10/2012 9:18:39 AM
P
PART
At time time of 08:40 am, the discharge into the storm drain inlet off of Myrtle appears to be clean. Still waiting on lab results from Strata on the first intial samples. Also waiting on ACHD to give a background NTU level for what samples must be based off of to meet the water quality standards for the state of Idaho. Due to dewatering activities occuring for a potental period of more than ten days, the turbidity cannot exceed over 20 NTU's based upon background.