Inspections for the day of: Tuesday, September 10, 2013.
Number of inspections: 12
Percentage of inspections complete: 83 %
Percentage of inspections not complete: 17 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00350 INSP-Supply line flush9/5/20139/6/2013 P 
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
FIR13-00348 INSP-Supply line flush9/5/20139/6/2013 P 
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
FIR13-00230 INSP-Sprinkler Rough-in/Hydro9/9/20139/10/20139/11/2013 7:17:31 AMPNR
Hydro for systems Phone #: ###-#### >> Inspection requested via web by John Venche
FIR13-00204 INSP-Final Inspection9/9/20139/10/20139/11/2013 7:16:31 AMAPASS
Forward flow testing completed satisfactory.
FIR13-00296 INSP-Final Inspection9/9/20139/10/20139/11/2013 7:15:35 AMAPASS
Remainder of fire alarm testing completed satisfactory. Fire alarm permit finaled.
FIR13-00418 INSP-Final Inspection9/9/20139/10/20139/11/2013 7:14:39 AMAPASS
Hood suppression system operated correctly under test conditions. Permit finaled.
BLD13-02349 FIRE-Final Inspection9/10/20139/10/20139/11/2013 7:13:12 AMPFAIL
Missing panic hardware, exit signs/EM lights, and signage at the main entry/exit per plan review red-lines. Also need to remove storage from the mezzanine level and replace one fire extinguisher at the recieving area with the correct rating/size.
FIR13-00328 INSP-Sprinkler Rough-in9/9/20139/10/20139/11/2013 7:11:15 AMAPART
Overhead fire sprinkler work at two areas as marked and dated on approved plans are approved for drop ceiling cover.
FIR12-00717 INSP-Final Inspection9/9/20139/10/20139/11/2013 7:10:00 AMAPART
Okayed fire sprinkler work at phase 2A only.
FIR12-00366 INSP-Sprinkler Rough-in9/10/20139/10/20139/10/2013 11:11:23 AMPPART
Rough-in at one exam room and the new work room okayed- note* Floorplan does not match provided permit documents, field modifications to branchline also noted.
FIR12-00550 INSP-Sprinkler Rough-in9/9/20139/10/20139/10/2013 11:07:21 AMAPART
Overhead work in phase 3 as noted on approved plans okayed for ceiling cover.
BLD13-01927 FIRE-Conference9/9/20139/10/20139/10/2013 11:04:43 AMADONE
On site visit to determine status of work in progress and discuss project related fire sprinkler permit activity and system repairs.