FIR13-00350
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00348
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00230
| INSP-Sprinkler Rough-in/Hydro | 9/9/2013 | 9/10/2013 | 9/11/2013 7:17:31 AM | P | NR |
|
|
Hydro for systems Phone #: ###-#### >> Inspection requested via web by John Venche
|
FIR13-00204
| INSP-Final Inspection | 9/9/2013 | 9/10/2013 | 9/11/2013 7:16:31 AM | A | PASS |
|
|
Forward flow testing completed satisfactory.
|
FIR13-00296
| INSP-Final Inspection | 9/9/2013 | 9/10/2013 | 9/11/2013 7:15:35 AM | A | PASS |
|
|
Remainder of fire alarm testing completed satisfactory. Fire alarm permit finaled.
|
FIR13-00418
| INSP-Final Inspection | 9/9/2013 | 9/10/2013 | 9/11/2013 7:14:39 AM | A | PASS |
|
|
Hood suppression system operated correctly under test conditions. Permit finaled.
|
BLD13-02349
| FIRE-Final Inspection | 9/10/2013 | 9/10/2013 | 9/11/2013 7:13:12 AM | P | FAIL |
|
|
Missing panic hardware, exit signs/EM lights, and signage at the main entry/exit per plan review red-lines. Also need to remove storage from the mezzanine level and replace one fire extinguisher at the recieving area with the correct rating/size.
|
FIR13-00328
| INSP-Sprinkler Rough-in | 9/9/2013 | 9/10/2013 | 9/11/2013 7:11:15 AM | A | PART |
|
|
Overhead fire sprinkler work at two areas as marked and dated on approved plans are approved for drop ceiling cover.
|
FIR12-00717
| INSP-Final Inspection | 9/9/2013 | 9/10/2013 | 9/11/2013 7:10:00 AM | A | PART |
|
|
Okayed fire sprinkler work at phase 2A only.
|
FIR12-00366
| INSP-Sprinkler Rough-in | 9/10/2013 | 9/10/2013 | 9/10/2013 11:11:23 AM | P | PART |
|
|
Rough-in at one exam room and the new work room okayed- note* Floorplan does not match provided permit documents, field modifications to branchline also noted.
|
FIR12-00550
| INSP-Sprinkler Rough-in | 9/9/2013 | 9/10/2013 | 9/10/2013 11:07:21 AM | A | PART |
|
|
Overhead work in phase 3 as noted on approved plans okayed for ceiling cover.
|
BLD13-01927
| FIRE-Conference | 9/9/2013 | 9/10/2013 | 9/10/2013 11:04:43 AM | A | DONE |
|
|
On site visit to determine status of work in progress and discuss project related fire sprinkler permit activity and system repairs.
|