ESC13-00887
| Site Preparation | 9/4/2013 | 9/4/2013 | | P | |
|
|
jeff Phone #: ###-####
|
ESC13-00555
| General Inspection | 9/6/2013 | 9/6/2013 | | | |
|
|
|
BLD13-01285
| BLD-Footing | 9/9/2013 | 9/10/2013 | 9/10/2013 2:56:16 PM | P | CANC |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Wrong permit called in.
|
ESC13-00750
| BMP Violation | 9/10/2013 | 9/10/2013 | 9/10/2013 2:55:39 PM | P | PART |
|
|
Sweep all silts from hard surfaces
|
ESC13-00752
| BMP Violation | 9/10/2013 | 9/10/2013 | 9/10/2013 2:55:05 PM | P | PART |
|
|
Sweep all silts from hard surfaces
|
ESC13-00762
| BMP Violation | 9/10/2013 | 9/10/2013 | 9/10/2013 2:54:34 PM | P | PART |
|
|
Sweep all silts from hard surfaces.
|
BLD13-02048
| BLD-Energy code compliance | 9/10/2013 | 9/10/2013 | 9/10/2013 2:53:38 PM | P | PASS |
|
|
steve Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD13-02056
| BLD-Energy code compliance | 9/10/2013 | 9/10/2013 | 9/10/2013 2:52:47 PM | P | PASS |
|
|
steve Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade
|
BLD13-02055
| BLD-Energy code compliance | 9/10/2013 | 9/10/2013 | 9/10/2013 2:51:43 PM | P | PASS |
|
|
steve Phone #: ###-####. rigid insulation at interior side of stemwall under slab on grade.
|
BLD13-02212
| BLD-Footing | 9/10/2013 | 9/10/2013 | 9/10/2013 1:32:32 PM | P | PASS |
|
|
chachos Phone #: ###-####
|
BLD13-01289
| BLD-Wall Bracing | 9/10/2013 | 9/10/2013 | 9/10/2013 1:02:38 PM | A | PASS |
|
|
Sheer Phone #: ###-#### >> Inspection requested via web by Mike McHargue. 1st, 2nd and 3rd floor exterior shearwalls ok. ok to cover exterior of building.
|
BLD13-02387
| BLD-Other | 9/9/2013 | 9/10/2013 | 9/10/2013 10:36:47 AM | A | PASS |
|
|
MH Setup Phone #: ###-#### >> Inspection requested via web by Richard Estes. block and tie only ok.
|
GCB13-00089
| GCB-Framing | 9/9/2013 | 9/10/2013 | 9/10/2013 9:09:07 AM | A | PART |
|
|
###-#### courtesy inspection. Will special inspection on welding for added beam. Refer to architect regarding elevation changes for sidewalk at north side of building. Ok to one side ofter rough ins are complete and inspected.
|
BLD13-01285
| BLD-Foundation | 9/6/2013 | 9/10/2013 | 9/9/2013 3:04:59 PM | P | CANC |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Inspection cancelled via mobile web on Monday, September 09, 2013.
|