Inspections for the day of: Wednesday, September 10, 2014.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00246 INSP-Conference9/10/20149/10/20149/10/2014 4:16:03 PMPDONE
BLD14-01252 FIRE-Final Inspection9/10/20149/10/20149/10/2014 3:44:43 PMPPASS
Life safety inspection completed satisfactory.
FIR14-00455 INSP-Sprinkler Rough-in/Hydro9/10/20149/10/20149/10/2014 3:28:15 PMPPART
Completed hydrostatic testing for the dry standpipe only.
BLD14-00949 FIRE-Final Inspection9/9/20149/10/20149/10/2014 12:04:26 PMAPASS
Phase four fire life safety completed satisfactory. Scope of work finished. Inspection passed.
FIR14-00254 INSP-Final Inspection9/8/20149/10/20149/10/2014 12:02:42 PMAPASS
Remainder of fire alarm modifications at the final phase passed inspection and functional testing. Permit finaled.
FIR14-00264 INSP-Final Inspection9/10/20149/10/20149/10/2014 12:01:11 PMAPASS
Final walkthrough and inspection completed satisfactory. Fire sprinkler permit finaled.