MEC15-04202
| Final | 9/4/2015 | 9/10/2015 | 9/10/2015 3:30:51 PM | P | PASS |
|
|
Technician on job-Dwight @ ###-#### Phone #: ###-#### Inspection requested via web by Rick Borg
|
PLM15-02324
| Plumbing Rough-in | 9/10/2015 | 9/10/2015 | 9/10/2015 2:54:24 PM | P | PART |
|
|
Call Travis to get details on where all the gauges are located Phone #: ###-#### Inspection requested via web by Travis Baker non-potable water piping test ok, needs labels. roof drain test ok, swamp cooler drains ok. move non-potable water connection to existing to downstream of premise dcva. provide secondary roof drainage. roof drain strainers required.
|
MEC15-04060
| Final | 9/10/2015 | 9/10/2015 | 9/10/2015 2:49:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Travis Baker gas piping ok
|
MEC15-01123
| Mec-Request for Extension | 9/10/2015 | 9/10/2015 | 9/10/2015 1:55:48 PM | P | PASS |
|
|
extention ok
|
MEC15-04265
| Final | 9/9/2015 | 9/10/2015 | 9/10/2015 1:54:31 PM | P | PASS |
|
|
Please have inspector call installer Aaron at ###-#### to meet for flue test and final mechanical inspection. Home owner is Joann at ###-#### Phone #: ###-#### Inspection requested via web by Carolyn Rudd
|
MEC14-04611
| Conference | 9/9/2015 | 9/10/2015 | 9/10/2015 1:54:06 PM | A | PART |
|
|
Ben ###-####/Lower H corridors 2nd floor ceiling grid. Phone #: ###-#### Inspection requested via web by Crystal Grant lower floor H ceiling ok for tile
|
MEC14-04611
| Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 1:53:17 PM | A | PART |
|
|
Ben/###-####/Lower F corridors 2nd floor ceiling grid. Phone #: ###-#### Inspection requested via web by Crystal Grant second floor F corridors ok for grid
|
MEC15-04261
| Pressure Test | 9/9/2015 | 9/10/2015 | 9/10/2015 9:32:50 AM | A | PASS |
|
|
David (homeowner) Gage on right side of home Phone #: ###-#### 60# gas test ok
|
MEC15-04261
| Final | 9/9/2015 | 9/10/2015 | 9/10/2015 9:29:10 AM | A | PASS |
|
|
David (homeowner) Phone #: ###-#### 60# gas test ok
|
MEC15-04243
| Final | 9/10/2015 | 9/10/2015 | 9/10/2015 9:18:02 AM | A | PASS |
|
|
Please call Random at ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
|
MEC15-04243
| Pressure Test | 9/10/2015 | 9/10/2015 | 9/10/2015 9:16:52 AM | A | PASS |
|
|
Please call Random at ###-#### prior to inspection Phone #: ###-#### Inspection requested via web by Tami Kelly
|
MEC15-04230
| Rough-in | 9/8/2015 | 9/10/2015 | 9/10/2015 9:08:30 AM | A | NR |
|
|
Change day per Julie Phone #: ###-#### just a conference about ducting from existing in crawl to toe kick in new space.
|
MEC15-03591
| Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 8:34:52 AM | A | PART |
|
|
Ceiling cover. Please call Ben on your way so he can meet you there. Thank you! Phone #: ###-#### Inspection requested via web by RaChelle Frisbee ok for tile in the office area. needs gas to the unit in the ceiling still and insulation was against the b-vent of the unit in the office. didn't approve the unit heater in the shop area it will be ready at final.
|