BLD15-02365
| BLD-Final | 9/10/2015 | 9/10/2015 | 9/10/2015 4:12:52 PM | P | CANC |
|
|
Dave Phone #: ###-####
|
BLD15-02365
| BLD-Energy code compliance | 9/10/2015 | 9/10/2015 | 9/10/2015 4:12:30 PM | P | PASS |
|
|
Dave Phone #: ###-####
|
BLD15-03063
| BLD-Final | 9/10/2015 | 9/10/2015 | 9/10/2015 4:09:48 PM | P | DONE |
|
|
Walter Phone #: ###-####
|
BLD15-02027
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 4:09:40 PM | P | DONE |
|
|
Inspection requested via web by Sandra Judge
|
BLD15-02027
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 4:09:33 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances
|
BLD15-03063
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 4:07:42 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances
|
BLD15-02027
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 3:33:52 PM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances
|
BLD15-02515
| BLD-Foundation | 9/9/2015 | 9/10/2015 | 9/10/2015 3:30:55 PM | P | DEFR |
|
|
Dane Phone #: ###-####. concrete already placed upon arriving on site.
|
BLD15-02916
| BLD-Final | 9/10/2015 | 9/10/2015 | 9/10/2015 3:23:29 PM | P | CANC |
|
|
Preston Phone #: ###-####
|
BLD15-02916
| BLD-Framing/Rough-in | 9/10/2015 | 9/10/2015 | 9/10/2015 3:23:08 PM | P | NR |
|
|
Preston Phone #: ###-####
|
BLD15-02055
| BLD-Footing | 9/9/2015 | 9/10/2015 | 9/10/2015 3:09:42 PM | P | CANC |
|
|
Dane Phone #: ###-####. Czncelled by dane via phone call.
|
ESC13-01200
| Site Final | 9/10/2015 | 9/10/2015 | 9/10/2015 3:09:05 PM | P | DONE |
|
|
|
ESC13-01200
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 3:08:54 PM | P | PASS |
|
|
|
BLD13-03319
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 3:08:43 PM | P | PASS |
|
|
Please call with 15 minute lead time. Thank you, Scott Phone #: ###-#### Inspection requested via web by Scott Zierler
|
BLD15-02647
| BLD-Wall Bracing | 9/9/2015 | 9/10/2015 | 9/10/2015 2:30:25 PM | P | PASS |
|
|
Dane Phone #: ###-####
|
BLD15-00246
| BLD-Footing | 9/9/2015 | 9/10/2015 | 9/10/2015 1:51:02 PM | P | NR |
|
|
Dane Phone #: ###-####
|
BLD15-00278
| BLD-Conference | 9/10/2015 | 9/10/2015 | 9/10/2015 1:40:13 PM | P | DONE |
|
|
Phone #: ###-#### Inspection requested via web by Paul Thompson
|
BLD15-01973
| BLD-Framing/Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 1:23:14 PM | P | PART |
|
|
David Phone #: ###-####. INterior steel stud framed wall and soffit ok, pending elec. rough in inspection.
|
BLD15-01646
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 11:39:44 AM | A | NR |
|
|
Jason Phone #: ###-####. Needs fire/life asfety?
|
BLD15-01447
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 11:38:46 AM | A | DONE |
|
|
Cindy Phone #: ###-####
|
BLD15-01447
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 11:38:31 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
GCB15-00126
| GCB-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 11:37:46 AM | A | PASS |
|
|
Eric ###-#### - block and tie insp... Not a final. Block and tie only ok.
|
BLD15-01646
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 11:11:49 AM | P | PASS |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
BLD15-02116
| BLD-Framing/Rough-in | 9/9/2015 | 9/10/2015 | 9/10/2015 10:58:40 AM | A | PASS |
|
|
Bill Phone #: ###-####
|
BLD15-01432
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 10:41:36 AM | A | PASS |
|
|
|
BLD15-01432
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 10:41:27 AM | P | PASS |
|
|
|
BLD15-01235
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 10:41:13 AM | A | PASS |
|
|
Karen Phone #: ###-####. Ok for perm occ.
|
BLD15-02975
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 10:26:08 AM | A | PASS |
|
|
Call 15mins before // Chris Phone #: ###-####. Ok for perm occ.
|
BLD15-01425
| BLD-Final | 9/9/2015 | 9/10/2015 | 9/10/2015 10:17:41 AM | A | PASS |
|
|
Requested by John Saucerman. Phone #: ###-#### Inspection requested via web by Shane Treasure
|
BLD15-01425
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 10:16:47 AM | P | PASS |
|
|
Hanrails repaired.
|
BLD15-01902
| BLD-Final | 9/8/2015 | 9/10/2015 | 9/10/2015 9:52:57 AM | A | PASS |
|
|
Gemma Phone #: ###-####
|
BLD15-01902
| DOC - Permit Finaled | 9/10/2015 | 9/10/2015 | 9/10/2015 9:52:47 AM | P | PASS |
|
|
|
BLD15-00981
| BLD-Ceiling Grid Inspection | 9/9/2015 | 9/10/2015 | 9/10/2015 9:30:15 AM | A | PART |
|
|
Jerry Phone #: ###-####. Ceiling grid in customer service area ok, pending fire sprinkler rough in.
|
BLD15-02550
| BLD-Conference | 9/3/2015 | 9/10/2015 | 9/10/2015 9:08:43 AM | A | DONE |
|
|
Check on staus of 5 day notice. Mech permit has been finaled. A life safety inspection has been completed and are making the corrections.
|
BLD14-03450
| BLD-Final | 9/10/2015 | 9/10/2015 | 9/10/2015 12:00:00 AM | P | CANC |
|
|
Ed Phone #: ###-####
|