Inspections for the day of: Monday, September 10, 2018.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE18-03445 Electrical Rough-In9/10/20189/10/20189/10/2018 3:07:58 PMPPASS
Ask for key at front or building
Moved switches by south door
moving switch and light by storage room and bath room Phone #: ###-#### Inspection requested via web by cal crosby Ok cover S door singel switch.
ELE18-03449 Rough-In Permanent Service9/10/20189/10/20189/10/2018 3:00:36 PMPPASS
Phone #: ###-#### Inspection requested via web by John VanZandt p/s u/g n ok
ELE18-02423 Final9/10/20189/10/20189/10/2018 2:42:09 PMPCANC
Dustin is the site contact. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Re-scheduled for 9/10/18
ELE18-01899 Final9/7/20189/10/20189/10/2018 2:29:24 PMAPASS
###-#### Ok final.
ELE18-02754 Electrical Rough-In9/10/20189/10/20189/10/2018 2:28:50 PMPPASS
Back area Ceiling cover Phone #: ###-#### Inspection requested via web by cris flores Ok cover back ceiling area and kitchenette.
ELE18-03141 Electrical Rough-In9/10/20189/10/20189/10/2018 1:28:46 PMPPASS
Basement Ceiling please - later afternoon if possible - Thank you Phone #: ###-#### Inspection requested via web by Winters LLC Ok cover SW corner of basement.
ELE18-03378 Permanent Service9/10/20189/10/20189/10/2018 1:27:35 PMPPASS
Just need to get the new equipment approved to be energized for now. I''ll coordinate with Idaho Power to do the change-over, and schedule a final inspection after that''s done. New equipment is on the South side of the house. Phone #: ###-#### Inspection requested via web by Troy Cobb 2 grd rods. p/s o/h n ok
ELE18-02916 Rough-In Permanent Service9/7/20189/10/20189/10/2018 12:32:53 PMAPASS
Call Wayne with any questions. ###-#### Phone #: ###-#### Inspection requested via web by William Salts p/s u/g n ok
ELE18-03368 Rough-In Permanent Service9/7/20189/10/20189/10/2018 12:23:25 PMAPASS
Phone #: ###-#### Inspection requested via web by Heath Thomas p/s u/g n ok
ELE18-02922 Electrical Rough-In9/9/20189/10/20189/10/2018 11:52:18 AMAPASS
underground inspection for conduits between southern perimeter buildings including across new entrance at south side of property off Common St.
(3) conduit locations.
Call Todd if questions Phone #: ###-#### Inspection requested via web by Todd Hall Ok cover conduits between buildings. 2 locations 18", 3rd location atleast 24".
ELE18-01450 Final9/6/20189/10/20189/10/2018 11:45:02 AMAPASS
Phone #: ###-#### Inspection requested via web by Jonathan Poot Ok final. Auto cover and lights function properly.
ELE18-03357 Electrical Rough-In9/10/20189/10/20189/10/2018 10:24:22 AMAPASS
After 8:30-9
Inspect Solar equipment Phone #: ###-#### Inspection requested via web by michael hunt Ok cover. All items UL listed.
ELE18-03440 Final9/7/20189/10/20189/10/2018 10:23:44 AMAPASS
Panel is in backyard near chicken coop Phone #: ###-#### Inspection requested via web by TRENT Swaim Ok final. 20a max mini split system fed from 20a brkr with #12.
ELE18-03392 Final9/7/20189/10/20189/10/2018 10:23:00 AMAPASS
Rework of existing boiler. New pumps added and zone/relay expander. Inspection only for boiler work. Work has nothing to do with existing building and electrical Permits.Homeowner should be on site. Just let her know you’re there to look at the boiler. Call with any questions. Phone #: ###-#### Inspection requested via web by Garrett Collins Ok final. Power was existing. Cleaned up old wiring and added a disconnect fed from 15a brkr.
ELE18-03417 Final9/7/20189/10/20189/10/2018 9:31:30 AMAPASS
Homeowner will Be home Mark ###-####. If you have any questions please feel free to contact Jake ###-####. Thanks!! Phone #: ###-#### Inspection requested via web by Clayton Morgan Ok final 1 TR recept for fireplace.
ELE18-03441 Rough-In Permanent Service9/9/20189/10/20189/10/2018 9:19:25 AMAPASS
Phone #: ###-#### Inspection requested via web by TOM BICANDI p/s o/h n ok
ELE18-03168 Conference9/4/20189/10/20189/10/2018 8:45:23 AMADONE
Call half hour before to meet // Christian Phone #: ###-#### Discussed requirement for 2 grd rods. and trench depth.