Inspections for the day of: Thursday, September 11, 1997.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE97-03065 INSP - T/S and Final9/11/19979/11/19979/12/1997 12:00:00 AMPPASS
09/11/97 315 - 49&14 ok jf u/g new
ELE97-02553 INSP - Final9/10/19979/11/19979/11/1997 12:00:00 AMAPASS
09/10/97 315 - DOOR SHOULD BE OPEN 14 ok jf
ELE97-02592 INSP - Final9/10/19979/11/19979/11/1997 12:00:00 AMAFAIL
09/10/97 315 - Scheduled by Hello! on 09/10/97 at 09:11:30. 14 failed cor. posted 110-16 access to j tub motor 210-70 install back g door light
ELE97-02947 INSP - Ele Rough-In/Perm Svc9/10/19979/11/19979/11/1997 12:00:00 AMACANC
09/10/97 315 - no 53 09 only see added 09 inspection request
ELE97-03049 INSP - Electrical Rough-In9/10/19979/11/19979/11/1997 12:00:00 AMACANC
09/10/97 315 - Scheduled by Hello! on 09/10/97 at 11:57:10. was done 09/10/97 pm jf ok
ELE97-03058 INSP - Final9/10/19979/11/19979/11/1997 12:00:00 AMAFAIL
09/10/97 315 - CALL ###-#### SO THEY CAN MEET YOU THERE. GATE CODE *9798 14 failed 09 ok jf see added 09 inspection request
ELE97-03062 INSP - Ele Rough-In/Perm Svc9/11/19979/11/19979/11/1997 12:00:00 AMPPASS
09/11/97 315 - 09&53 ok jf 14rms 1a/c 200a u/g new
ELE97-03064 INSP - Ele Rough-In/Perm Svc9/11/19979/11/19979/11/1997 12:00:00 AMPPASS
09/11/97 315 - 09&53 ok jf 11rms 1a/c 200a u/g new
ELE97-01687 INSP - Final9/11/19979/11/19979/11/1997 12:00:00 AMPPASS
09/11/97 315 - 14 ok jf sur posted, 110-3(b), 300-10 sign can be turned are made