Inspections for the day of: Monday, September 11, 2000.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM00-03185 Water and/or Sewer9/8/20009/11/20009/11/2000 12:00:00 AMAPASS
###-#### ready at 10:30
PLM00-03204 Sprinkler (Final)9/8/20009/11/20009/11/2000 12:00:00 AMAPASS
Shondi ###-####
PLM99-04006 Final9/8/20009/11/20009/11/2000 12:00:00 AMAFAIL
Scheduled by Inspector: 330 On 9/8/2000 could not find a final that was ready on site???? is this a r/i ? left a message with Raweul at ###-#### 9/11/2000 11:03:34 AM
PLM00-03209 Groundwork9/11/20009/11/20009/11/2000 12:00:00 AMAPASS
Added by Inspector: 330 On 9/11/2000
PLM00-02653 Roof Drains9/11/20009/11/20009/11/2000 12:00:00 AMPPART
Mike ###-#### partial rain drains behind building ok 9/11/2000 4:09:52 PM
PLM00-03187 Water and/or Sewer9/11/20009/11/20009/11/2000 12:00:00 AMPPASS
underground final for w/s Mike ###-#### s/w final ok with sewer droped at conection to building drain into alighnment 9/11/2000 4:07:34 PM
PLM00-03215 Plumbing Rough-in9/11/20009/11/20009/11/2000 12:00:00 AMPPART
sheryl ###-#### gw ok sewer and water installed at this project without permit or inspection, robert grubb with wright bros. is in search of a reason no ri till this is ironed out 9/11/2000 4:09:06 PM