BLD00-02475
| BLD-Foundation | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | A | FAIL |
|
|
JACK ###-#### FOUND WALL INSP poured without insp no plans on site 9/11/2000 11:07:35 AM
|
BLD00-02002
| BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | A | FAIL |
|
|
Elliot ###-#### no plans 9/11/2000 9:57:46 AM
|
BLD00-02314
| BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | A | FAIL |
|
|
FR INSP DALE- ###-#### cn posted 9/11/2000 11:06:32 AM
|
BLD00-00601
| BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | A | PASS |
|
|
Jim ###-#### 2nd floor framing 9/11/2000 12:05:44 PM ok to cover 2nd floor walls only 9/11/2000 12:06:13 PM
|
MEC00-02952
| Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 15:56:16. Contact: ###-####.
|
BLD99-02837
| BLD-Final | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | A | PASS |
|
|
Mike ###-#### 9/11/2000 8:29:57 AM
|
BLD00-01593
| BLD-Framing/Rough-in | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | P | CANC |
|
|
Brad ###-####
|
BLD00-02371
| BLD-Final | 9/8/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | P | PASS |
|
|
ALSO-FIRE FN-- ###-#### TOM FN OCC FOR RACKING
|
BLD00-01643
| BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | P | PART |
|
|
###-#### 9/11/2000 4:08:53 PM hear nail ok for ext at loading dock 9/11/2000 4:09:17 PM
|
BLD00-02007
| BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | P | PART |
|
|
shear wall Chris ###-#### ok to side 9/11/2000 5:07:40 PM
|
BLD00-02155
| BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | P | PASS |
|
|
###-#### ok after elec is ok 9/11/2000 4:36:26 PM
|
BLD00-01050
| BLD-Framing/Rough-in | 9/11/2000 | 9/11/2000 | 9/11/2000 12:00:00 AM | P | PART |
|
|
###-#### david 9/11/2000 2:47:04 PM ok to cover corridor walls and ac shafts 9/11/2000 2:48:09 PM
|