ELE01-03164
| Electrical Rough-In | 9/7/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | FAIL |
|
|
###-#### cor. posted see JF the whole job is in violation of the N E C 9/11/2001 2:33:44 PM
|
ELE01-03078
| Final | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 08:41:44. Contact: ###-####. ok 9/12/2001 11:22:23 AM
9/12/2001 11:22:26 AM
|
ELE01-03093
| Final | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 13:59:37. Contact: ###-####. p/s o/h rec ok Al's electric will change out damaged 30 2 pole breaker 9/11/2001 11:33:15 AM
|
ELE01-03181
| Electrical Rough-In | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
r/i- call 1st before insp mike- ###-#### ok 9/11/2001 4:27:05 PM
|
ELE01-03182
| Permanent Service | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
###-#### p/s o/h rec. ok JF wind blew tree over, and damaged service mast 9/11/2001 3:51:40 PM
|
ELE01-03069
| Permanent Service | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
###-#### p/s o/h rec, ok 9/11/2001 2:56:02 PM
|
ELE01-03137
| Electrical Rough-In | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 09:56:51. Contact: ###-####. 300-4 protection, and 11/4 for cable , staple cable within 8 inches of boxes , and cable seath shall extend into boxes 9/11/2001 3:05:17 PM
|
ELE01-01537
| Electrical Rough-In | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 11:22:50. Contact: ###-####. conference 9/11/2001 4:59:03 PM
|