MEC01-02697
| Pressure Test | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 09:34:16. Contact: ###-####. need final, appears ok for use. 9/11/2001 10:49:14 AM
|
MEC01-02233
| Final | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
call 1/2 hr prior ###-####
|
MEC01-01902
| Final | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | FAIL |
|
|
###-####; duct r/i shows ok; issued c/n...no permit for gas line and fireplace. 9/11/2001 10:19:00 AM
|
BLD01-01642
| BLD-Framing/Rough-in | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PART |
|
|
###-#### ok to cover wash bay, need insp for 1hr lid as discussed, verify 1hr east wall at next insp. 9/11/2001 11:09:53 AM
|
BLD01-02350
| BLD-Conference | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/11/2001 9:40:09 AM issued SWO...addl bath room added, obtain permits. no dbl fee if obtained by 9-13-01
|
BLD01-01564
| BLD-Conference | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 340 On 9/11/2001 10:20:18 AM w/ owner...need mec permit for fireplace & gas line prior to final...may have been inspected inadvertantly.
|
BLD01-01556
| BLD-Framing/Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | FAIL |
|
|
Added by Inspector: 340 On 9/11/2001 1:46:15 PM need install int layers gyp at horiz. shaft; infill 1st floor openings & seal "shaft" & verify s/f damper at bsmt side entry to shaft.
|
BLD98-03705
| BLD-Conference | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 9/11/2001 4:39:17 PM w/ Mike Z...awaiting add'l temp exit info.
|
BLD01-00594
| BLD-Conference | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 9/11/2001 4:40:40 PM re frame details, fireblox, etc.
|
BLD01-01556
| BLD-Conference | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
dave- ###-#### for conf ...rec'd detail; added clarifications to sheet & approved. 9/11/2001 1:43:52 PM
|
BLD01-01633
| BLD-Framing/Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PART |
|
|
2hr shaft wall\\###-#### {not sure if fire or structural) cant'ed beam protection assy. 9/11/2001 4:30:46 PM
|
BLD01-00603
| BLD-Framing/Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PART |
|
|
###-#### initial stair framing..ok to hold stringers back from bldg wall to allow siding. 9/11/2001 3:05:34 PM
|