Inspections for the day of: Tuesday, September 11, 2001.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC01-02697 Pressure Test9/10/20019/11/20019/11/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/10/2001 at 09:34:16. Contact: ###-####. need final, appears ok for use. 9/11/2001 10:49:14 AM
MEC01-02233 Final9/10/20019/11/20019/11/2001 12:00:00 AMAPASS
call 1/2 hr prior ###-####
MEC01-01902 Final9/10/20019/11/20019/11/2001 12:00:00 AMAFAIL
###-####; duct r/i shows ok; issued c/n...no permit for gas line and fireplace. 9/11/2001 10:19:00 AM
BLD01-01642 BLD-Framing/Rough-in9/10/20019/11/20019/11/2001 12:00:00 AMAPART
###-#### ok to cover wash bay, need insp for 1hr lid as discussed, verify 1hr east wall at next insp. 9/11/2001 11:09:53 AM
BLD01-02350 BLD-Conference9/11/20019/11/20019/11/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 9/11/2001 9:40:09 AM issued SWO...addl bath room added, obtain permits. no dbl fee if obtained by 9-13-01
BLD01-01564 BLD-Conference9/11/20019/11/20019/11/2001 12:00:00 AMAPASS
Added by Inspector: 340 On 9/11/2001 10:20:18 AM w/ owner...need mec permit for fireplace & gas line prior to final...may have been inspected inadvertantly.
BLD01-01556 BLD-Framing/Rough-in9/11/20019/11/20019/11/2001 12:00:00 AMPFAIL
Added by Inspector: 340 On 9/11/2001 1:46:15 PM need install int layers gyp at horiz. shaft; infill 1st floor openings & seal "shaft" & verify s/f damper at bsmt side entry to shaft.
BLD98-03705 BLD-Conference9/11/20019/11/20019/11/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 9/11/2001 4:39:17 PM w/ Mike Z...awaiting add'l temp exit info.
BLD01-00594 BLD-Conference9/11/20019/11/20019/11/2001 12:00:00 AMPPASS
Added by Inspector: 340 On 9/11/2001 4:40:40 PM re frame details, fireblox, etc.
BLD01-01556 BLD-Conference9/11/20019/11/20019/11/2001 12:00:00 AMPPASS
dave- ###-#### for conf ...rec'd detail; added clarifications to sheet & approved. 9/11/2001 1:43:52 PM
BLD01-01633 BLD-Framing/Rough-in9/11/20019/11/20019/11/2001 12:00:00 AMPPART
2hr shaft wall\\###-#### {not sure if fire or structural) cant'ed beam protection assy. 9/11/2001 4:30:46 PM
BLD01-00603 BLD-Framing/Rough-in9/11/20019/11/20019/11/2001 12:00:00 AMPPART
###-#### initial stair framing..ok to hold stringers back from bldg wall to allow siding. 9/11/2001 3:05:34 PM