PLM01-02638
| Plumbing Rough-in | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 12:37:31. Contact: ###-####.
|
PLM01-03101
| Water and/or Sewer | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
don ###-#### w/s final #50
|
PLM01-03102
| Water and/or Sewer | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | NR |
|
|
don ###-#### w/s final #51
|
PLM01-03104
| Sprinkler (Final) | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
renee backflow
|
PLM01-03108
| Sprinkler (Final) | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
###-####
|