BLD01-01285
| BLD-Framing/Rough-in | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PART |
|
|
###-#### DRYWALL NAILING ON SHEER WALL
not all the way done yet 9/11/2001 11:24:04 AM
|
BLD01-01731
| BLD-Final | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PASS |
|
|
CALL FIRST ###-####
ok for c of o when trades are signed off 9/11/2001 1:39:35 PM
|
BLD01-00451
| BLD-Final | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 07:34:33. Contact: ###-####.need plumbing sign off, all else looks ok 9/11/2001 10:57:51 AM
|
BLD01-00534
| BLD-Wall cover | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 10:14:08. Contact: ###-####.
|
BLD01-00846
| BLD-Framing/Rough-in | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/10/2001 at 13:02:54. Contact: ###-####.
insulation ok, (wip) need to see int. drywall shear 9/11/2001 10:24:30 AM
|
BLD01-01564
| BLD-Final | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
###-####
c of c issued 9/11/2001 2:43:01 PM
|
BLD01-02378
| BLD-Conference | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
look at set back, t/w Angie p/z 9/10/2001 4:09:30 PM ok as built per Roger w/ p/z 9/11/2001 11:01:40 AM
|
BLD00-03643
| BLD-Conference | 9/10/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
go over fire blocking w/ Bill, and what material 9/11/2001 11:02:47 AM
|
BLD01-01285
| BLD-Framing/Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
###-####
ok w/ verbal corrections 9/11/2001 1:14:13 PM
|
BLD01-00451
| BLD-Final | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | FAIL |
|
|
verify plumbing sign off 9/11/2001 10:52:03 AM
no plumbing yet 9/12/2001 9:33:19 AM
|
BLD00-02083
| BLD-Footing | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/11/2001 at 10:56:05. Contact: ###-####.
wip on east ftgs, verbal corrections 9/11/2001 3:02:30 PM
|
BLD01-00534
| BLD-Framing/Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PART |
|
|
ok to cover after gas test passes and all 3 fireplaces have permits 9/11/2001 1:06:40 PM
|
MEC01-02632
| Rough-in | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 415 On 9/11/2001 12:52:46 PM
|
MEC01-01902
| Final | 9/11/2001 | 9/11/2001 | 9/11/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 415 On 9/11/2001 2:42:10 PM
|
BLD01-01043
| BLD-Final | 9/10/2001 | 9/11/2001 | 9/10/2001 12:00:00 AM | A | PASS |
|
|
call first ###-#### or ###-#### Boyd
|