Inspections for the day of: Tuesday, September 11, 2001.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01285 BLD-Framing/Rough-in9/10/20019/11/20019/11/2001 12:00:00 AMAPART
###-#### DRYWALL NAILING ON SHEER WALL
not all the way done yet 9/11/2001 11:24:04 AM
BLD01-01731 BLD-Final9/10/20019/11/20019/11/2001 12:00:00 AMAPASS
CALL FIRST ###-####
ok for c of o when trades are signed off 9/11/2001 1:39:35 PM
BLD01-00451 BLD-Final9/10/20019/11/20019/11/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/10/2001 at 07:34:33. Contact: ###-####.need plumbing sign off, all else looks ok 9/11/2001 10:57:51 AM
BLD01-00534 BLD-Wall cover9/10/20019/11/20019/11/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/10/2001 at 10:14:08. Contact: ###-####.
BLD01-00846 BLD-Framing/Rough-in9/10/20019/11/20019/11/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/10/2001 at 13:02:54. Contact: ###-####.
insulation ok, (wip) need to see int. drywall shear 9/11/2001 10:24:30 AM
BLD01-01564 BLD-Final9/10/20019/11/20019/11/2001 12:00:00 AMPPASS
###-####
c of c issued 9/11/2001 2:43:01 PM
BLD01-02378 BLD-Conference9/10/20019/11/20019/11/2001 12:00:00 AMPPASS
look at set back, t/w Angie p/z 9/10/2001 4:09:30 PM ok as built per Roger w/ p/z 9/11/2001 11:01:40 AM
BLD00-03643 BLD-Conference9/10/20019/11/20019/11/2001 12:00:00 AMPPASS
go over fire blocking w/ Bill, and what material 9/11/2001 11:02:47 AM
BLD01-01285 BLD-Framing/Rough-in9/11/20019/11/20019/11/2001 12:00:00 AMPPASS
###-####
ok w/ verbal corrections 9/11/2001 1:14:13 PM
BLD01-00451 BLD-Final9/11/20019/11/20019/11/2001 12:00:00 AMPFAIL
verify plumbing sign off 9/11/2001 10:52:03 AM
no plumbing yet 9/12/2001 9:33:19 AM
BLD00-02083 BLD-Footing9/11/20019/11/20019/11/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/11/2001 at 10:56:05. Contact: ###-####.
wip on east ftgs, verbal corrections 9/11/2001 3:02:30 PM
BLD01-00534 BLD-Framing/Rough-in9/11/20019/11/20019/11/2001 12:00:00 AMPPART
ok to cover after gas test passes and all 3 fireplaces have permits 9/11/2001 1:06:40 PM
MEC01-02632 Rough-in9/11/20019/11/20019/11/2001 12:00:00 AMPPASS
Added by Inspector: 415 On 9/11/2001 12:52:46 PM
MEC01-01902 Final9/11/20019/11/20019/11/2001 12:00:00 AMPPASS
Added by Inspector: 415 On 9/11/2001 2:42:10 PM
BLD01-01043 BLD-Final9/10/20019/11/20019/10/2001 12:00:00 AMAPASS
call first ###-#### or ###-#### Boyd