PLM02-02650
| Plumbing Rough-in | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | FAIL |
|
|
JUDY WORK # ###-####; Phone #: ###-#### Internet Inspection Request from: Darla Downs need to change kit-sink drain to two inch and change fernco coupling to no hub band on vent connection 9/11/2002 12:23:03 PM
|
PLM02-02553
| Plumbing Rough-in | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | PASS |
|
|
|
PLM02-02800
| Water and/or Sewer | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | PASS |
|
|
air test on sewer line test ok 9/11/2002 5:35:34 PM
|
PLM02-02438
| Plumbing Rough-in | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
PLM02-02546
| Plumbing Rough-in | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PART |
|
|
###-#### north side bathroom group air test ok 9/11/2002 4:09:11 PM
|
PLM02-02820
| Water and/or Sewer | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
swr line bob- ###-####
|
PLM02-02776
| Water and/or Sewer | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Pam Masselli new sewer test ok contractor to call when turn around is done 9/11/2002 3:33:31 PM
|
PLM02-01540
| Roof Drains | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 14:31:21. Contact: ###-####.
|
PLM02-02803
| Water Softner Final | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | CANC |
|
|
brian ###-#### canc. by brian 9/11/2002 5:32:40 PM
|
PLM02-02807
| Sprinkler (Final) | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
###-####- fred
|