ELE02-02814
| Rough-In Permanent Service | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | PASS |
|
|
###-#### ok cover ri p/s u/g n ok survey all grounds connected together in kit box 9/11/2002 10:12:51 AM
|
ELE02-02817
| Rough-In Permanent Service | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | PART |
|
|
GARY ###-#### conf with contractor 9/11/2002 9:55:51 AM
|
ELE02-00982
| Rough-In Permanent Service | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | NR |
|
|
###-#### todd t/w home owner regarding 11/4 inch, make up, light outside for man door 9/11/2002 10:59:33 AM
|
ELE02-02712
| Permanent Service | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | CANC |
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Rita DeYoung canc should be temp inspection
|
ELE02-01963
| Final | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/10/2002 at 20:24:30. Contact: ###-####. ok final 9/11/2002 10:28:40 AM
|
ELE02-02712
| Temporary Service | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | FAIL |
|
|
ok to put in this morning per mike k. jay ###-#### correction nec 406.8 9/11/2002 9:32:17 AM
|
ELE02-02832
| Electrical Rough-In | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### ok cover ri survey bathrm curcuit can not be for closet downstairs 9/11/2002 1:19:21 PM
|
ELE02-02827
| Electrical Rough-In | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
CONFERENCE ###-#### ok cover ri 9/11/2002 2:01:41 PM
|
ELE02-02565
| Final | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/11/2002 at 07:32:15. Contact: ###-####. conf with contractor kit. area food preperation locations 9/11/2002 12:39:32 PM
|
ELE02-01098
| Final | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
###-#### ok final 9/11/2002 3:12:08 PM
|