Inspections for the day of: Wednesday, September 11, 2002.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01225 FIRE-Final Inspection9/10/20029/11/20029/11/2002 12:00:00 AMAFAIL
provide Boise City approved fire alarm plans, do not install manual flush bolts on warehouse door, provide approved door hardware on the southfacing exit door, test fire alarm system 9/11/2002 2:20:39 PM
FIR02-00244 INSP-Final Inspection9/10/20029/11/20029/11/2002 12:00:00 AMAFAIL
fire sprinkler piping is ok for cover but I could not final due to no ceiling tile being installed 9/11/2002 8:17:08 AM
FIR02-00368 INSP-Conference9/11/20029/11/20029/11/2002 12:00:00 AMADONE
Notified general contractor that duct detectors will need to be added for automatic shut down of atleast four hvac units that serve the common area and that that work will need to be shown on the fire alarm drawings
FIR02-00297 INSP-Final Inspection9/11/20029/11/20029/11/2002 12:00:00 AMPPASS
fire sprinkler system finaled
FIR02-00318 INSP-Final Inspection9/11/20029/11/20029/11/2002 12:00:00 AMPPART
hydro test of the sprinkler piping is OK, but for the roughin, the insulation needs to be installed at the deck or the uprights need to be raised, fill all of the combustible concealed spaces with insulation or provide sprinkler heads (these spaces are on the 2nd floor), replace extended coverage head on the second floor with a standard head, install the remaining earth quake bracing 9/11/2002 2:57:50 PM