BLD02-01225
| FIRE-Final Inspection | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | FAIL |
|
|
provide Boise City approved fire alarm plans, do not install manual flush bolts on warehouse door, provide approved door hardware on the southfacing exit door, test fire alarm system 9/11/2002 2:20:39 PM
|
FIR02-00244
| INSP-Final Inspection | 9/10/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | FAIL |
|
|
fire sprinkler piping is ok for cover but I could not final due to no ceiling tile being installed 9/11/2002 8:17:08 AM
|
FIR02-00368
| INSP-Conference | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | A | DONE |
|
|
Notified general contractor that duct detectors will need to be added for automatic shut down of atleast four hvac units that serve the common area and that that work will need to be shown on the fire alarm drawings
|
FIR02-00297
| INSP-Final Inspection | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PASS |
|
|
fire sprinkler system finaled
|
FIR02-00318
| INSP-Final Inspection | 9/11/2002 | 9/11/2002 | 9/11/2002 12:00:00 AM | P | PART |
|
|
hydro test of the sprinkler piping is OK, but for the roughin, the insulation needs to be installed at the deck or the uprights need to be raised, fill all of the combustible concealed spaces with insulation or provide sprinkler heads (these spaces are on the 2nd floor), replace extended coverage head on the second floor with a standard head, install the remaining earth quake bracing 9/11/2002 2:57:50 PM
|