Inspections for the day of: Monday, September 11, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00407 INSP-Final Inspection9/11/20069/11/20069/11/2006 4:07:52 PMPNR
Project is not complete for final, rough-in inspection failed.
FIR05-00272 INSP-Sprinkler Rough-in/Hydro9/8/20069/11/20069/11/2006 4:06:47 PMPPART
AG hydrostatic test passed.
FIR06-00407 INSP-Sprinkler Rough-in9/11/20069/11/20069/11/2006 3:16:35 PMPFAIL
One head is blocked by a light fixture in the NE hallway, heads are overspaced in the north hall at two locations, work room head is overspaced off one adjacent wall, overspacing at the west side of the teller area, inspection concluded at this time due to the number of defficiencies-east side of the TI area not inspected today.
FIR06-00347 INSP-Final Inspection9/8/20069/11/20069/11/2006 3:11:18 PMAPASS
Final fire alarm inspection passed.
FIR06-00349 INSP-Final Inspection9/8/20069/11/20069/11/2006 3:10:48 PMAPASS
Fire alarm work passed inspection.
FIR05-00403 INSP-Sprinkler Rough-in9/8/20069/11/20069/11/2006 10:25:10 AMAPART
OH rough-in is good for cover on the first and second floors only, third floor will require a tenting inspection prior to cover.
MIS06-00229 FIR-Final9/5/20069/11/20069/11/2006 10:20:20 AMAPASS
Life safety passed inspection.