Inspections for the day of: Monday, September 11, 2006.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03360 BLD-Aging Inspection9/11/20069/11/20069/11/2006 5:03:43 PM CANC
MIS05-00026 MIS-Aging Inspection9/11/20069/11/20069/11/2006 5:03:29 PM CANC
MIS05-00045 MIS-Aging Inspection9/11/20069/11/20069/11/2006 5:03:01 PM CANC
BLD06-02090 BLD-Footing9/11/20069/11/20069/11/2006 3:49:29 PMPPART
anton - garage; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD06-02089 BLD-Footing9/11/20069/11/20069/11/2006 3:49:14 PMPPART
BLD06-02018 BLD-Energy code compliance9/8/20069/11/20069/11/2006 3:00:38 PMPPASS
roy; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. All framing issues have been resolved. Airseal ok. insul ok. ok to cover.
BLD06-02549 BLD-Foundation9/11/20069/11/20069/11/2006 2:18:06 PMPPASS
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Noted that rigid insulation will need to be installed on the exterior side of stemwall.
BLD06-01583 BLD-Final9/11/20069/11/20069/11/2006 1:35:57 PMPNR
val ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Needs elec.final.
BLD06-01637 BLD-Final9/8/20069/11/20069/11/2006 11:14:22 AMAPASS
These are the Peterson Auto Body shop signs on the new building on the s/w corner of their lot.; Phone #: ###-#### Internet Inspection Request from: Eric Shaner
BLD06-01637 DOC - Permit Finaled9/11/20069/11/20069/11/2006 11:14:13 AMPPASS
BLD06-01766 BLD-Final9/8/20069/11/20069/11/2006 11:02:49 AMAPASS
Pearle Vision signs on the s/w corner of Emerald and s. Cole; Phone #: ###-#### Internet Inspection Request from: Eric Shaner
BLD06-01766 DOC - Permit Finaled9/11/20069/11/20069/11/2006 11:02:34 AMPPASS
BLD06-02307 BLD-Final9/8/20069/11/20069/11/2006 10:47:57 AMAPASS
This is the "Cingular" sign right behind KFC.; Phone #: ###-#### Internet Inspection Request from: Eric Shaner
BLD06-02307 DOC - Permit Finaled9/11/20069/11/20069/11/2006 10:47:44 AMPPASS
BLD06-01781 BLD-Final9/8/20069/11/20069/11/2006 10:47:34 AMACANC
This is the "Suzuki" sign on the building at the Dennis Dillon lot. the pole sign was existing.; Phone #: ###-#### Internet Inspection Request from: Eric Shaner
BLD06-01781 DOC - Permit Finaled9/11/20069/11/20069/11/2006 10:47:21 AMPPASS
BLD06-00528 BLD-Final9/8/20069/11/20069/11/2006 10:46:55 AMAFAIL
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. HC sign required on door to restroom at Rx. Locks need to be switched out at rear restrooms. Also needs mech final. Sub contractor has not paid tthe reqiured fees.
BLD06-01369 BLD-Final9/8/20069/11/20069/11/2006 10:44:52 AMADONE
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Racking was never installed. Visually verfied with appropved plans. Permit needs to be voided.
BLD06-02354 BLD-Foundation9/8/20069/11/20069/11/2006 9:18:51 AMAPASS
stem wall inspection//dennis harmon ###-####
BLD04-00917 BLD-Aging Inspection9/11/20069/11/20069/11/2006 8:48:10 AM CANC
BLD04-00917 DOC - Permit Finaled9/11/20069/11/20069/11/2006 8:48:02 AMAPASS
BLD05-03345 BLD-Aging Inspection9/11/20069/11/20069/11/2006 8:46:12 AM PASS
wip on new fire sprinklers.