BLD07-01642
| FIRE-Conference | 9/11/2007 | 9/11/2007 | 9/11/2007 5:17:04 PM | P | DONE |
|
|
I went over the live safety notes with the contractor
|
FIR07-00717
| INSP-Sprinkler Rough-in | 9/11/2007 | 9/11/2007 | 9/11/2007 4:52:57 PM | P | PASS |
|
|
The sprinkler piping is ok to cover.
|
FIR05-00536
| INSP-Final Inspection | 9/10/2007 | 9/11/2007 | 9/11/2007 3:53:53 PM | P | FAIL |
|
|
It appears at this time that the areas covered under phase one are complete. This includes the basement, first, second, third, sixth, seventh and penthouse floors. A portion of the south tower where it connects to the new central tower is still under construction but is separated from the central tower by walls and doors.
|
FIR07-00776
| INSP-Final Inspection | 9/10/2007 | 9/11/2007 | 9/11/2007 3:49:28 PM | A | PASS |
|
|
The hood suppression system operated correctly for both hoods.
|
FIR07-00665
| INSP-Final Inspection | 9/10/2007 | 9/11/2007 | 9/11/2007 1:40:31 PM | A | PASS |
|
|
Permit finaled. The contractor had to move the sampling tube in the west duct detector to meet the installation requirements.
|
BLD07-02399
| FIRE-Final Inspection | 9/10/2007 | 9/11/2007 | 9/11/2007 11:24:53 AM | A | PASS |
|
|
life safety passed. Contractor is going to install address numbers on the north side of the building.
|
FIR07-00626
| INSP-Alarm Testing | 9/10/2007 | 9/11/2007 | 9/10/2007 9:51:24 AM | P | CANC |
|
|
Troy, Please call me as soon as you know about when you can be out at this project. Thank You. Jason Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|