Inspections for the day of: Tuesday, September 11, 2007.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-01642 FIRE-Conference9/11/20079/11/20079/11/2007 5:17:04 PMPDONE
I went over the live safety notes with the contractor
FIR07-00717 INSP-Sprinkler Rough-in9/11/20079/11/20079/11/2007 4:52:57 PMPPASS
The sprinkler piping is ok to cover.
FIR05-00536 INSP-Final Inspection9/10/20079/11/20079/11/2007 3:53:53 PMPFAIL
It appears at this time that the areas covered under phase one are complete. This includes the basement, first, second, third, sixth, seventh and penthouse floors. A portion of the south tower where it connects to the new central tower is still under construction but is separated from the central tower by walls and doors.
FIR07-00776 INSP-Final Inspection9/10/20079/11/20079/11/2007 3:49:28 PMAPASS
The hood suppression system operated correctly for both hoods.
FIR07-00665 INSP-Final Inspection9/10/20079/11/20079/11/2007 1:40:31 PMAPASS
Permit finaled. The contractor had to move the sampling tube in the west duct detector to meet the installation requirements.
BLD07-02399 FIRE-Final Inspection9/10/20079/11/20079/11/2007 11:24:53 AMAPASS
life safety passed. Contractor is going to install address numbers on the north side of the building.
FIR07-00626 INSP-Alarm Testing9/10/20079/11/20079/10/2007 9:51:24 AMPCANC
Troy, Please call me as soon as you know about when you can be out at this project. Thank You. Jason Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick