Inspections for the day of: Thursday, September 11, 2008.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00367 FIR-Aging Inspection9/11/20089/11/20089/12/2008 2:55:15 PM NR
Per Robert Spinden Idaho Power is still in the process of installing duct smoke detectors.
FIR08-00410 INSP-Sprinkler Rough-in/Hydro9/10/20089/11/20089/11/2008 3:46:32 PMPPASS
The underground hydro test passed
FIR08-00563 INSP-Sprinkler Rough-in/Hydro9/10/20089/11/20089/11/2008 2:57:24 PMAFAIL
This inspection was for the cover of the piping above the restrooms on the second floor. The piping can not be covered until the existing insulation is re-attached to the roof deck and sprinkler protection is provided in the pipe chase between the two restrooms. I also spoke to Todd about resubmittals showing all of the additional upright heads addded due to full height walls.
FIR08-00188 INSP-Sprinkler Rough-in/Hydro9/10/20089/11/20089/11/2008 12:09:34 PMAPASS
Forward Flow Test passed
BLD08-01880 FIRE-Final Inspection9/10/20089/11/20089/11/2008 11:13:27 AMAPART
Provide corrected sprinkler coverage as discussed and provide approved single action hardware on the north exit door.