Inspections for the day of: Friday, September 11, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00390 INSP-Final Inspection9/10/20099/11/20099/18/2009 4:21:28 PMAPART
Bryan Phone #: ###-####
FIR09-00261 INSP-Final Inspection9/11/20099/11/20099/15/2009 4:26:52 PMPPART
Jeff Phone#: ###-####
FIR07-00515 INSP-Sprinkler Rough-in/Hydro9/10/20099/11/20099/14/2009 7:11:31 AMPPART
Underground fire supply line and remote FDC piping hydrostatic testing completed satisfactory.
BLD09-01452 FIRE-Conference9/10/20099/11/20099/11/2009 1:43:11 PMADONE
On site conference regarding tenant remodel which will require modifications to spacing and location of existing fire sprinkler heads at some areas.
BLD09-01084 FIRE-Alarm Testing9/11/20099/11/20099/11/2009 1:39:31 PMPPASS
Inspection intended for a fire final. Fire life safety passed.
BLD09-01084 FIRE-Conference9/11/20099/11/20099/11/2009 1:17:19 PMADONE
On site review of project related fire life safety issues including fire sprinklers, suite addressing, fire extinguishers, occupant load signs, door hardware, and related trade permits.
FIR09-00514 INSP-Final Inspection9/9/20099/11/20099/11/2009 1:15:31 PMAPASS
Fire alarm work tested satisfactory after repairs made while on site, permit finaled.
FIR09-00469 INSP-Final Inspection9/10/20099/11/20099/11/2009 1:14:05 PMAPASS
Hood suppression system functioned properly under test conditions, permit finaled.