FIR09-00390
| INSP-Final Inspection | 9/10/2009 | 9/11/2009 | 9/18/2009 4:21:28 PM | A | PART |
|
|
Bryan Phone #: ###-####
|
FIR09-00261
| INSP-Final Inspection | 9/11/2009 | 9/11/2009 | 9/15/2009 4:26:52 PM | P | PART |
|
|
Jeff Phone#: ###-####
|
FIR07-00515
| INSP-Sprinkler Rough-in/Hydro | 9/10/2009 | 9/11/2009 | 9/14/2009 7:11:31 AM | P | PART |
|
|
Underground fire supply line and remote FDC piping hydrostatic testing completed satisfactory.
|
BLD09-01452
| FIRE-Conference | 9/10/2009 | 9/11/2009 | 9/11/2009 1:43:11 PM | A | DONE |
|
|
On site conference regarding tenant remodel which will require modifications to spacing and location of existing fire sprinkler heads at some areas.
|
BLD09-01084
| FIRE-Alarm Testing | 9/11/2009 | 9/11/2009 | 9/11/2009 1:39:31 PM | P | PASS |
|
|
Inspection intended for a fire final. Fire life safety passed.
|
BLD09-01084
| FIRE-Conference | 9/11/2009 | 9/11/2009 | 9/11/2009 1:17:19 PM | A | DONE |
|
|
On site review of project related fire life safety issues including fire sprinklers, suite addressing, fire extinguishers, occupant load signs, door hardware, and related trade permits.
|
FIR09-00514
| INSP-Final Inspection | 9/9/2009 | 9/11/2009 | 9/11/2009 1:15:31 PM | A | PASS |
|
|
Fire alarm work tested satisfactory after repairs made while on site, permit finaled.
|
FIR09-00469
| INSP-Final Inspection | 9/10/2009 | 9/11/2009 | 9/11/2009 1:14:05 PM | A | PASS |
|
|
Hood suppression system functioned properly under test conditions, permit finaled.
|