Inspections for the day of: Friday, September 11, 2009.
Number of inspections: 8
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 13 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00552 Site Preparation9/4/20099/4/2009   
MIS09-00127 MIS-Aging Inspection9/11/20099/11/20099/16/2009 6:56:46 AM PASS
BLD09-00583 BLD-Final9/10/20099/11/20099/11/2009 8:35:44 PMACANC
pat Phone #: ###-####
GCB09-00033 GCB-Final9/11/20099/11/20099/11/2009 8:34:58 PMPFAIL
linda - patio cover - please call 1/2 hr prior Phone #: ###-#### this should have been a framing but the contractor has already covered framing I told home owner to have the contractor call me I cant final with out doing a framing first
BLD09-00295 BLD-Framing/Rough-in9/10/20099/11/20099/11/2009 8:31:09 PMPPART
Joel-after 2 please Phone #: ###-#### ok to cover new 2hr corrador
BLD09-00583 BLD-Final9/11/20099/11/20099/11/2009 8:29:40 PMPPART
pat - fireplace Phone #: ###-#### ok to final after fire places are finaled
BLD09-01084 BLD-Final9/11/20099/11/20099/11/2009 2:43:49 PMPPASS
jess Phone #: ###-#### ok for perm occ
BLD08-01451 DOC - Permit Finaled9/11/20099/11/20099/11/2009 6:12:15 AMAPASS