FIR11-00560
| FIR-Aging Inspection | 9/11/2012 | 9/11/2012 | 9/12/2012 3:41:41 PM | | NR |
|
|
I spoke with Deb again about the job status. She was going to talk to Rob with Protex about the job status.
|
FIR12-00266
| INSP-Final Inspection | 9/10/2012 | 9/11/2012 | 9/12/2012 8:01:35 AM | P | FAIL |
|
|
Provide pressure relief valve. Forward flush passed.
|
BLD12-01722
| FIRE-Final Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 2:54:59 PM | P | FAIL |
|
|
Need the project related fire alarm and fire sprinkler permits addressed. Need the signage on the riser room door and the knox box mounted. Building inspector will need to approve of the fire caulking in the riser room wall.
|
BLD12-00761
| FIRE-Final Inspection | 9/11/2012 | 9/11/2012 | 9/11/2012 2:53:48 PM | P | FAIL |
|
|
Need the project related fire alarm and fire sprinkler permits addressed. Need the signage on the riser room door and the knox box mounted.
|
FIR12-00280
| INSP-Final Inspection | 9/10/2012 | 9/11/2012 | 9/11/2012 2:51:39 PM | P | FAIL |
|
|
None of the addressing on the city approved plans matches the actual installed addresses. Also after testing was completed I found the the monitoring account had not been set up and no signals had been received by the monitoring station. The hi/low pressure switch has been programed for alarm and not the required supervisory signal. A map at the facp has not been provided yet. Teh manual pull station was mounted too high but was lowered prior to my leaving the job site.. Phone lines tested ok. Entire system will need to be retested when the monitoring account has been set up.
|
BLD12-01693
| FIRE-Final Inspection | 9/10/2012 | 9/11/2012 | 9/11/2012 2:38:05 PM | A | PASS |
|
|
life safety passed.Per Troy Cobbley did not need Fire alarm permit//9-17-12 BAS
|
FIR12-00506
| INSP-Conference | 9/10/2012 | 9/11/2012 | 9/11/2012 12:25:09 PM | A | DONE |
|
|
Glen and I agreed that the manual pull station for the hood suppression system could be mounted at the south wall exit doorway. The manual pull station still must meet IFC height requirements.
|
BLD12-01122
| FIRE-Final Inspection | 9/10/2012 | 9/11/2012 | 9/11/2012 12:06:50 PM | A | PASS |
|
|
Life safety passed. Per Scott and I's discussion the racks do not require a permit since they fall under the square footage requirement. However a racking permit may be required by the building inspector for seismic verification.
|