Inspections for the day of: Tuesday, September 11, 2012.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00154 General Inspection9/11/20129/11/20129/12/2012 2:51:14 PM FAIL
Message to RP to contact me over stock piles and the earth ramp.
ESC12-00430 General Inspection9/10/20129/11/20129/11/2012 5:11:08 PMPDONE
Conference:
Went over general provisions including but limited to;
perimeter control required when slopes are 2% or greater or if stockpiles are near right a way.
staging of material, placement of material
providing a "sealed, leak proof " washout.
Will follow up in two weeks with a Site preperation inspection.
ESC11-00482 Aging Inspection9/11/20129/11/20129/11/2012 4:45:50 PM DONE
Permit finaled.
ESC11-00482 DOC - Permit Finaled9/11/20129/11/20129/11/2012 4:45:36 PMPPASS
ESC11-00482 DOC - Permit Finaled9/11/20129/11/20129/11/2012 4:33:08 PMPPASS
ESC11-00833 General Inspection9/11/20129/11/20129/11/2012 4:32:07 PM PASS
ESC12-00198 General Inspection9/11/20129/11/20129/11/2012 4:03:35 PM PASS
ESC12-00680 General Inspection9/11/20129/11/20129/11/2012 9:29:31 AM PASS
ESC12-00755 Site Preparation9/10/20129/11/20129/11/2012 9:29:06 AMAPASS
ESC12-00661 General Inspection9/11/20129/11/20129/11/2012 9:28:42 AM PASS
ESC12-00077 General Inspection9/11/20129/11/20129/11/2012 9:28:30 AM PART
Still area of in activity on large potios of the sub division. Have relayed the the requirement per the 2012 CGP over stabilization of all disturbed soil due to inactivity for more than 14 day. I have been told that vertical construction will be occuring soon but has not yet. I explained to him that he is still responsible for stabilization though.
ESC11-00922 Aging Inspection9/11/20129/11/20129/11/2012 9:23:14 AM PASS