Inspections for the day of: Wednesday, September 11, 2013.
Number of inspections: 5
Percentage of inspections complete: 60 %
Percentage of inspections not complete: 40 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00350 INSP-Supply line flush9/5/20139/6/2013 P 
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
FIR13-00348 INSP-Supply line flush9/5/20139/6/2013 P 
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
FIR13-00230 INSP-Sprinkler Rough-in/Hydro9/11/20139/11/20139/12/2013 10:52:33 AMPPART
Completed satisfactory hydrostatic testing for the new dry system piping at the 1st, 2nd, and 3rd, floors. Also verified previous correction items are finished or underway.
FIR13-00421 INSP-Sprinkler Rough-in9/11/20139/11/20139/12/2013 10:50:32 AMPPART
Overhead work okayed to cover under condition record drawings are provided reflecting field changes in pipe routing.
FIR13-00420 INSP-Final Inspection9/10/20139/11/20139/12/2013 10:33:18 AMAPART
Okay to cover overhead fire sprinkler modifications per the scope of work at the grid ceiling areas.