FIR13-00350
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00348
| INSP-Supply line flush | 9/5/2013 | 9/6/2013 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
FIR13-00230
| INSP-Sprinkler Rough-in/Hydro | 9/11/2013 | 9/11/2013 | 9/12/2013 10:52:33 AM | P | PART |
|
|
Completed satisfactory hydrostatic testing for the new dry system piping at the 1st, 2nd, and 3rd, floors. Also verified previous correction items are finished or underway.
|
FIR13-00421
| INSP-Sprinkler Rough-in | 9/11/2013 | 9/11/2013 | 9/12/2013 10:50:32 AM | P | PART |
|
|
Overhead work okayed to cover under condition record drawings are provided reflecting field changes in pipe routing.
|
FIR13-00420
| INSP-Final Inspection | 9/10/2013 | 9/11/2013 | 9/12/2013 10:33:18 AM | A | PART |
|
|
Okay to cover overhead fire sprinkler modifications per the scope of work at the grid ceiling areas.
|