FIR13-00359
| INSP-Sprinkler Rough-in | 9/10/2013 | 9/11/2013 | 9/11/2013 3:37:39 PM | P | PART |
|
|
Plans need to be resubmitted due to extensive pipe routing changes on the first and second floors. Third floor piping matches but can not be covered until a tenting inspection has been passed. I noted eight overspaced heads on the first and second floors at the east and west end bedrooms (see marked plans). All in all no piping can be covered yet.
|
BLD13-01941
| FIRE-Final Inspection | 9/10/2013 | 9/11/2013 | 9/11/2013 2:18:20 PM | A | FAIL |
|
|
Inspection was actually just a conference. Dave and I went over possible fire sprinkler obstructions for this build out and over door hardware.
|
BLD13-02422
| FIRE-Final Inspection | 9/11/2013 | 9/11/2013 | 9/11/2013 2:03:39 PM | P | FAIL |
|
|
Repair three exit signs, add one exit sign and provide emergency lighting in all paths of egress as discussed.
|
BLD13-01745
| FIRE-Final Inspection | 9/11/2013 | 9/11/2013 | 9/11/2013 12:32:43 PM | P | PASS |
|
|
Life safety passed
|
FIR12-00695
| INSP-Sprinkler Rough-in | 9/10/2013 | 9/11/2013 | 9/11/2013 11:31:32 AM | A | PASS |
|
|
Lounge area piping is ok to cover..
|
FIR13-00263
| INSP-Sprinkler Rough-in/Hydro | 9/10/2013 | 9/11/2013 | 9/11/2013 11:30:25 AM | A | PASS |
|
|
hydro bldg 12 passed ; flush bldg 14 passed
|