Inspections for the day of: Wednesday, September 11, 2013.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00359 INSP-Sprinkler Rough-in9/10/20139/11/20139/11/2013 3:37:39 PMPPART
Plans need to be resubmitted due to extensive pipe routing changes on the first and second floors. Third floor piping matches but can not be covered until a tenting inspection has been passed. I noted eight overspaced heads on the first and second floors at the east and west end bedrooms (see marked plans). All in all no piping can be covered yet.
BLD13-01941 FIRE-Final Inspection9/10/20139/11/20139/11/2013 2:18:20 PMAFAIL
Inspection was actually just a conference. Dave and I went over possible fire sprinkler obstructions for this build out and over door hardware.
BLD13-02422 FIRE-Final Inspection9/11/20139/11/20139/11/2013 2:03:39 PMPFAIL
Repair three exit signs, add one exit sign and provide emergency lighting in all paths of egress as discussed.
BLD13-01745 FIRE-Final Inspection9/11/20139/11/20139/11/2013 12:32:43 PMPPASS
Life safety passed
FIR12-00695 INSP-Sprinkler Rough-in9/10/20139/11/20139/11/2013 11:31:32 AMAPASS
Lounge area piping is ok to cover..
FIR13-00263 INSP-Sprinkler Rough-in/Hydro9/10/20139/11/20139/11/2013 11:30:25 AMAPASS
hydro bldg 12 passed ; flush bldg 14 passed