Inspections for the day of: Thursday, September 11, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00492 INSP-Sprinkler Rough-in/Hydro9/11/20149/11/20149/11/2014 3:09:09 PMPPASS
Overhead hydro test and rough-in passed. Piping can not be covered until tenting has been inspected.
FIR14-00610 INSP-Sprinkler Rough-in9/11/20149/11/20149/11/2014 2:33:28 PMPPASS
Approved cover for partial underground. See the city approved plans for locations.
FIR14-00475 INSP-Sprinkler Rough-in9/8/20149/11/20149/11/2014 2:18:53 PMPCANC
Cancel per John is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
BLD14-01144 FIRE-Final Inspection9/11/20149/11/20149/11/2014 1:36:43 PMPPASS
Life safety passed
BLD14-02080 FIRE-Final Inspection9/11/20149/11/20149/11/2014 1:36:23 PMPPASS
life safety passed
FIR14-00367 INSP-Sprinkler Rough-in/Hydro9/10/20149/11/20149/11/2014 12:52:31 PMPPASS
24 hour air test passed
FIR14-00581 INSP-Sprinkler Rough-in9/10/20149/11/20149/11/2014 12:11:06 PMAPASS
Inspection was for the first floor only. With the removal of the upright heads the installation matches the revised plans. Tim is ok with the revised piping in the first floor. Piping can not be covered until the installation of the insulation has been approved.
BLD14-02425 FIRE-Final Inspection9/10/20149/11/20149/11/2014 10:01:37 AMAPASS
Life safety passed
BLD14-02426 FIRE-Final Inspection9/10/20149/11/20149/11/2014 9:44:24 AMAPASS
Life safety passed
FIR14-00660 INSP-Final Inspection9/10/20149/11/20149/11/2014 9:31:09 AMAPASS
Permit finaled
FIR14-00660 INSP-Sprinkler Rough-in9/10/20149/11/20149/11/2014 8:48:55 AMAPASS
John Phone #: ###-####
FIR14-00177 INSP-Sprinkler Rough-in/Hydro9/10/20149/11/20149/11/2014 8:48:33 AMAPASS
Underground hydro test passed