FIR14-00492
| INSP-Sprinkler Rough-in/Hydro | 9/11/2014 | 9/11/2014 | 9/11/2014 3:09:09 PM | P | PASS |
|
|
Overhead hydro test and rough-in passed. Piping can not be covered until tenting has been inspected.
|
FIR14-00610
| INSP-Sprinkler Rough-in | 9/11/2014 | 9/11/2014 | 9/11/2014 2:33:28 PM | P | PASS |
|
|
Approved cover for partial underground. See the city approved plans for locations.
|
FIR14-00475
| INSP-Sprinkler Rough-in | 9/8/2014 | 9/11/2014 | 9/11/2014 2:18:53 PM | P | CANC |
|
|
Cancel per John is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD14-01144
| FIRE-Final Inspection | 9/11/2014 | 9/11/2014 | 9/11/2014 1:36:43 PM | P | PASS |
|
|
Life safety passed
|
BLD14-02080
| FIRE-Final Inspection | 9/11/2014 | 9/11/2014 | 9/11/2014 1:36:23 PM | P | PASS |
|
|
life safety passed
|
FIR14-00367
| INSP-Sprinkler Rough-in/Hydro | 9/10/2014 | 9/11/2014 | 9/11/2014 12:52:31 PM | P | PASS |
|
|
24 hour air test passed
|
FIR14-00581
| INSP-Sprinkler Rough-in | 9/10/2014 | 9/11/2014 | 9/11/2014 12:11:06 PM | A | PASS |
|
|
Inspection was for the first floor only. With the removal of the upright heads the installation matches the revised plans. Tim is ok with the revised piping in the first floor. Piping can not be covered until the installation of the insulation has been approved.
|
BLD14-02425
| FIRE-Final Inspection | 9/10/2014 | 9/11/2014 | 9/11/2014 10:01:37 AM | A | PASS |
|
|
Life safety passed
|
BLD14-02426
| FIRE-Final Inspection | 9/10/2014 | 9/11/2014 | 9/11/2014 9:44:24 AM | A | PASS |
|
|
Life safety passed
|
FIR14-00660
| INSP-Final Inspection | 9/10/2014 | 9/11/2014 | 9/11/2014 9:31:09 AM | A | PASS |
|
|
Permit finaled
|
FIR14-00660
| INSP-Sprinkler Rough-in | 9/10/2014 | 9/11/2014 | 9/11/2014 8:48:55 AM | A | PASS |
|
|
John Phone #: ###-####
|
FIR14-00177
| INSP-Sprinkler Rough-in/Hydro | 9/10/2014 | 9/11/2014 | 9/11/2014 8:48:33 AM | A | PASS |
|
|
Underground hydro test passed
|