Inspections for the day of: Friday, September 11, 2015.
Number of inspections: 25
Percentage of inspections complete: 96 %
Percentage of inspections not complete: 4 %
Contact Information
InspectorPhil Shearer
TitleBLD-COM/RES INSPECTOR
Phone #794-9368
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS15-00236 BLD-Conference9/9/20159/9/2015 P 
Working without permits - dumpster out front, seen hauling debris from residence
MIS15-00217 MIS-Aging Inspection9/3/20159/11/20159/14/2015 10:39:33 AMPDONE
BLD14-03681 BLD-Final9/10/20159/11/20159/11/2015 4:00:05 PMAPASS
Call 1st Jeff seismic components and -engineering approval.......###-####.
Tony youg has reseved all documentation needed.
BLD14-03681 DOC - Permit Finaled9/11/20159/11/20159/11/2015 3:59:58 PMPPASS
BLD15-02528 BLD-Energy code compliance9/10/20159/11/20159/11/2015 3:56:50 PMPPASS
Insulation // Kevin Phone #: ###-####
BLD15-02042 BLD-Energy code compliance9/11/20159/11/20159/11/2015 3:49:10 PMPPASS
Julie Phone #: ###-####
GCB15-00067 GCB-Final9/10/20159/11/20159/11/2015 3:31:49 PMANR
Kevin ###-#### - requested call ahead
BLD15-02109 BLD-Wall Bracing9/11/20159/11/20159/11/2015 3:27:49 PMPFAIL
Phil Phone #: ###-####
BLD15-01333 BLD-Framing/Rough-in9/11/20159/11/20159/11/2015 3:12:46 PMPFAIL
Phone #: ###-#### Inspection requested via web by Austin Wagner
ESC15-00244 Site Final9/11/20159/11/20159/11/2015 2:54:15 PMPDONE
ESC15-00244 DOC - Permit Finaled9/11/20159/11/20159/11/2015 2:53:56 PMPPASS
BLD15-00679 BLD-Final9/11/20159/11/20159/11/2015 2:53:17 PMPPASS
Phone #: ###-#### Inspection requested via web by Austin Wagner
BLD15-00679 DOC - Permit Finaled9/11/20159/11/20159/11/2015 2:52:42 PMPPASS
BLD15-01065 BLD-Final9/11/20159/11/20159/11/2015 2:21:11 PMPNR
If home is locked please call for access ###-#### Inspection requested via web by Erby Gonzales
BLD15-01985 BLD-Foundation9/11/20159/11/20159/11/2015 2:11:44 PMPPASS
Inspection request time 2:30 Phone #: ###-#### Inspection requested via web by tony L
BLD15-01385 BLD-Energy code compliance9/8/20159/11/20159/11/2015 2:06:07 PMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD14-03207 BLD-Framing/Rough-in9/10/20159/11/20159/11/2015 1:42:28 PMAPART
Adam - Call prior to meet - Framing inspection, Metal Stud welding verification Phone #: ###-####. Stud welding east side grid L - J and stiff clips north side floors 4-8 grid 2-4
GCB15-00064 GCB-Framing9/10/20159/11/20159/11/2015 12:52:17 PMAPART
Grey ###-####. Straps over ducked through top plate
BLD14-03434 BLD-Final9/11/20159/11/20159/11/2015 12:11:53 PMANR
Phone #: ###-#### Inspection requested via web by phil doble
GCB15-00063 GCB-Fndatn/slab ins/fld vent9/9/20159/11/20159/11/2015 12:06:37 PMAPASS
John ###-####. Pending MTI inspection
BLD15-02042 BLD-Framing/Rough-in9/10/20159/11/20159/11/2015 11:34:37 AMAPASS
Change day per Julie Phone #: ###-####
BLD14-00772 BLD-Final9/10/20159/11/20159/11/2015 10:57:51 AMANR
Call 30min prior for access or questions - Abel Phone #: ###-####
BLD15-00679 BLD-Conference9/11/20159/11/20159/11/2015 10:46:45 AMPCANC
Phone #: ###-#### >> Inspection requested via web by Austin Wagner Inspection cancelled from web by: Austin Wagner
BLD15-02163 BLD-Energy code compliance9/10/20159/11/20159/11/2015 10:10:32 AMAPASS
Michael Phone #: ###-####
BLD15-02171 BLD-Energy code compliance9/10/20159/11/20159/11/2015 10:10:01 AMAPASS
Michael Phone #: ###-####