MEC18-03970
| Final | 9/10/2018 | 9/11/2018 | 9/11/2018 4:05:15 PM | P | NR |
|
|
final Phone #: ###-#### Inspection requested via web by Brandon Sorensen- Not ready refrigeration crew still has some work to finish
|
MEC18-03574
| Pressure Test | 9/11/2018 | 9/11/2018 | 9/11/2018 3:53:15 PM | P | PASS |
|
|
Contact: Robert Church ###-####. Phone #: ###-#### Inspection requested via web by Brent Lacy- 20lb gas pressure test to two new RTU's ok- piping R/I ok
|
MEC18-03960
| Final | 9/4/2018 | 9/11/2018 | 9/11/2018 3:52:03 PM | P | PASS |
|
|
Please call Zoe Brunelle prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette- A/C fuse sizes ok- furnace ac coil co ok
|
MEC18-04393
| Pressure Test | 9/11/2018 | 9/11/2018 | 9/11/2018 3:13:23 PM | P | FAIL |
|
|
David Phone #: ###-#### - 20lb gas pressure test fail gauge would not zero
|
MEC18-03811
| Rough-in | 9/11/2018 | 9/11/2018 | 9/11/2018 2:56:04 PM | P | FAIL |
|
|
105,106,205,206,305,306 Phone #: ###-#### Inspection requested via web by Gary Reeves -105 nail plate- floor boot needs sealed- supply trunk at furnace needs sealer 106- nail plate- fresh air duct needs sealer 205- nail plate- dryer box needs sealer on the back side 206- line set insulation has a rip- dryer box needs sealed 306- duct seal supply trunk at furnace and fresh air duct needs sealed at furnace
|
MEC18-01867
| Final | 9/6/2018 | 9/11/2018 | 9/11/2018 2:11:24 PM | P | FAIL |
|
|
Please call Gary 30 min prior to arrival Phone #: ###-#### Inspection requested via web by Andrea Grigsby- condensate needs supported out by the A/C and needs a 90 elbow turned down
|
MEC18-04080
| Final | 9/10/2018 | 9/11/2018 | 9/11/2018 1:50:08 PM | P | PASS |
|
|
field super: chad robertson Phone #: ###-#### Inspection requested via web by Lisa Whitney - furnace relocate coil co ok
|
MEC18-04348
| Final | 9/5/2018 | 9/11/2018 | 9/11/2018 1:28:55 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Marisa Hone- condensate needs to be piped out of the foundation and turned down with a 90 elbow
|
MEC18-02192
| Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 10:29:27 AM | A | PART |
|
|
Request above ceiling Bld C and Connect area duct seal inspection C ; D. Please contact Rob ###-#### with any questions or concerns. Phone #: ###-#### Inspection requested via web by Heather Gransbery - duct seal for connect area from D to C on NW side ok- bldC common area insulation ok up to gridline 3.4 cover ok -bldC south and west corridors insulation ok
|
MEC18-04169
| Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 10:11:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- R/I ok
|
MEC18-04169
| Pressure Test | 9/10/2018 | 9/11/2018 | 9/11/2018 10:11:08 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Gary Reeves- 20lb gas pressure test ok-2x 5lb flue pressure test ok
|
MEC18-04045
| Rough-in | 9/10/2018 | 9/11/2018 | 9/11/2018 8:55:43 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Stegemann- indoor firplace R/I ok- outdoor fireplace fail- combustrible material needs to be removed on the face of the fireplace (sheeting on the top and sides)
|
MEC12-02306
| Mec-Aging Inspection | 9/11/2018 | 9/11/2018 | 9/11/2018 8:36:47 AM | | DONE |
|
|
called contractor and left a message.
|
MEC17-04330
| Final | 9/10/2018 | 9/11/2018 | 9/11/2018 8:32:45 AM | A | PASS |
|
|
Please call tech if you need access/have questions: ###-#### Phone #: ###-#### Inspection requested via web by Melissa Skinner- RTU fuses ok- plumbing vents 10' away from fresh air intake- gas line supported- final ok
|