Inspections for the day of: Tuesday, September 11, 2018.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAdele J Schaffeld-Griffin
TitleASST BUILDING OFFICIAL
Phone #208-608-7098
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR18-00356 INSP-Sprinkler Rough-in9/10/20189/11/20189/11/2018 12:00:00 AMAPASS
Forrest inspection comments- Remainder of overhead fire sprinkler work at phase two 1st floor approved for ceiling cover. Refer to dated annotations on stamped plan sheet. Contractor to provide matched temp. heads
in common spaces between the new remodel area (200 deg. QR) and existing area (155 deg. QR) as discussed.
roy nelson Phone #: ###-#### >> Inspection requested via web by Brodie Stenquist
FIR18-00478 INSP-Final Inspection9/10/20189/11/20189/11/2018 12:00:00 AMAPASS
Forrest inspection comments-Final inspection for the scope of fire sprinkler work completed satisfactory. Permit final approved, signature card not available on site. Give Brian a call prior to heading out there. Phone #: ###-#### >> Inspection requested via web by Sam Ball
NAF18-00104 INSP-Final9/10/20189/11/20189/11/2018 12:00:00 AMPFAIL
1- door hardware shall have thumb turn removed. Or revise plans as only one exit is required from this space. As exit sigh in installed the doors shall be fully compliant.
2- provide signage over exit doors, This door to remain unlocked when building is occupied.
Call for reinspection. Call prior to going Phone #: 2088697423 >> Inspection requested via mobile web by Dillon
FIR18-00493 INSP-Final Inspection9/11/20189/11/20189/11/2018 12:00:00 AMPPASS
Forrest inspection comments-Scope of permit work passed final inspection. Occupancy request card signed and dated for fire sprinkler work. Terry Phone #: ###-####
FIR18-00489 INSP-Sprinkler Rough-in/Hydro9/10/20189/11/20189/11/2018 12:00:00 AMPPASS
Forrest inspection comments-Overhead rough-in inspection completed and passed. Freeze protection/insulation is not yet provided, approval for ceiling installation pending an additional for cover inspection. OH hydrostatic
test also completed and passed. Underground supply line is not yet installed.
Call Anthony before heading out, thank you! Phone #: ###-#### >> Inspection requested via web by Anthony Minichiello