ELE97-01838
| INSP - Electrical Rough-In | 9/11/1997 | 9/12/1997 | 9/12/1997 12:00:00 AM | A | PASS |
|
|
CEILING
|
ELE97-02945
| INSP - Final | 9/12/1997 | 9/12/1997 | 9/12/1997 12:00:00 AM | P | PASS |
|
|
jim you pass a pool bond on this job. that is all tiffey elec. did as he said another contractor doing rest of the job. so can or should i go in and final this job.??? let me know. thanks pat per jim schmer, bood bonding finaled. thats all ron ely has done.
|