Inspections for the day of: Friday, September 12, 1997.
Number of inspections: 2
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Schmer
TitleELE-CHIEF INSPECTOR
Phone #794-9423
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE97-01838 INSP - Electrical Rough-In9/11/19979/12/19979/12/1997 12:00:00 AMAPASS
CEILING
ELE97-02945 INSP - Final9/12/19979/12/19979/12/1997 12:00:00 AMPPASS
jim you pass a pool bond on this job. that is all tiffey elec. did as he said another contractor doing rest of the job. so can or should i go in and final this job.??? let me know. thanks pat per jim schmer, bood bonding finaled. thats all ron ely has done.