Inspections for the day of: Tuesday, September 12, 2000.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR99-00691 INSP-Sprinkler Rough-in/Hydro9/12/20009/12/20009/13/2000 12:00:00 AMPPASS
###-####- JIM SPR
FIR00-00472 INSP-Sprinkler Rough-in/Hydro9/12/20009/12/20009/12/2000 12:00:00 AMAPASS
Scheduled by Inspector: 409 On 9/12/2000
FIR00-00472 INSP-Sprinkler Rough-in/Hydro9/8/20009/12/20009/12/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/08/2000 at 13:01:59. Contact: ###-####. R/I AND HYDRO OKAY 9/12/2000 10:04:02 AM
BLD99-03720 FIRE-Final Inspection9/11/20009/12/20009/12/2000 12:00:00 AMAFAIL
structural is also going out Ron ###-#### rated doors in bathroom; exit signs; detectors for doors on hold opens 9/12/2000 10:04:56 AM
BLD00-02087 FIRE-Final Inspection9/11/20009/12/20009/12/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/11/2000 at 20:12:58. Contact: ###-####.
BLD00-01305 FIRE-Final Inspection9/12/20009/12/20009/12/2000 12:00:00 AMPPASS
JILL ###-#### & CELL ###-#### FIRE FN -ALSO FN OCC
FIR00-00381 INSP-Sprinkler Rough-in9/12/20009/12/20009/12/2000 12:00:00 AMPPASS
main underground Tom ###-#### underground okay to cover - still need flush and hydro 9/13/2000 11:07:45 AM
FIR99-00669 INSP-Sprinkler Rough-in9/7/20009/12/20009/12/2000 12:00:00 AMPFAIL
TODD- ###-#### R/I hydro test of 2,3,4,5,6 and attic areas pass; r/i revealed attic area not covered, 6th floor has major deviations from plans requiring resubmittal, head painted on 2nd janitor room, dry standpipe needs pitch to ensire drainage 9/13/2000 11:06:22 AM