FIR99-00691
| INSP-Sprinkler Rough-in/Hydro | 9/12/2000 | 9/12/2000 | 9/13/2000 12:00:00 AM | P | PASS |
|
|
###-####- JIM SPR
|
FIR00-00472
| INSP-Sprinkler Rough-in/Hydro | 9/12/2000 | 9/12/2000 | 9/12/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 409 On 9/12/2000
|
FIR00-00472
| INSP-Sprinkler Rough-in/Hydro | 9/8/2000 | 9/12/2000 | 9/12/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/08/2000 at 13:01:59. Contact: ###-####. R/I AND HYDRO OKAY 9/12/2000 10:04:02 AM
|
BLD99-03720
| FIRE-Final Inspection | 9/11/2000 | 9/12/2000 | 9/12/2000 12:00:00 AM | A | FAIL |
|
|
structural is also going out Ron ###-#### rated doors in bathroom; exit signs; detectors for doors on hold opens 9/12/2000 10:04:56 AM
|
BLD00-02087
| FIRE-Final Inspection | 9/11/2000 | 9/12/2000 | 9/12/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/11/2000 at 20:12:58. Contact: ###-####.
|
BLD00-01305
| FIRE-Final Inspection | 9/12/2000 | 9/12/2000 | 9/12/2000 12:00:00 AM | P | PASS |
|
|
JILL ###-#### & CELL ###-#### FIRE FN -ALSO FN OCC
|
FIR00-00381
| INSP-Sprinkler Rough-in | 9/12/2000 | 9/12/2000 | 9/12/2000 12:00:00 AM | P | PASS |
|
|
main underground Tom ###-#### underground okay to cover - still need flush and hydro 9/13/2000 11:07:45 AM
|
FIR99-00669
| INSP-Sprinkler Rough-in | 9/7/2000 | 9/12/2000 | 9/12/2000 12:00:00 AM | P | FAIL |
|
|
TODD- ###-#### R/I hydro test of 2,3,4,5,6 and attic areas pass; r/i revealed attic area not covered, 6th floor has major deviations from plans requiring resubmittal, head painted on 2nd janitor room, dry standpipe needs pitch to ensire drainage 9/13/2000 11:06:22 AM
|